Replace Project Westmoor Road and Orchard Grove Avenue.
City of Thomaston
Work to be completed for the Avenue N Stormwater & Road Repairs is described briefly as follows: In general, construction shall consist of installation of approx. 40 LF of 54" reinforced concrete pipe (RCP), two headwalls, two drop inlets, a standard duty asphalt road patch, and two 24" curb and gutter segments. Also, the project includes removing existing trees, site grading and stream channel improvements.
City of El Monte
Installing striping, pavement markings, continental crosswalks, striping removals, traffic signal equipment upgrades, loop detectors and battery backup systems.
Illinois Capital Development Board
Work includes to replace road, parking lot, and storm drain.
Release
Oct 21, 2025
Close
Nov 07, 2025