Summary
The contractor shall be responsible for the following: Carefully remove and save both antique gates. See Contracting Officer’s Representative (COR) for location to move gates for storage. Fabrication of a temporary security gate for the duration of the project. The new gate will be a wall mounted, service slider type gate. The service slider assembly requires complete removal of the
existing swing gate, and installation and alignment of TyMetal PLUSS10, closed loop beam. The existing gate opening in the wall is 18’-0” high and 18’-0” wide. See attached sketch #1 for wall opening details. Tymetal or technically equivalent security gate company engineering site visit to establish details of the custom closed loop beam. Complete the installation and alignment of a new locking column including the alignment, timing adjustment and
integration of the system. Removal of existing gate operator and replace with a new TYM0-VS type gate operator or approved technically equivalent type. Responsible for the transportation, unloading and assembly of the beam as well as removal and disposal of all existing equipment. Install any concrete forms, beams, ramps and foundations necessary to support the new gate. See attached file.