Summary
The State University Construction Fund (SUCF) is soliciting bids for Project 011050-00 to replace the heating plant chillers at SUNY Albany. The work includes replacing two existing absorption chillers with two 2,000-ton centrifugal chillers installed at grade, along with associated 15kV-to-480V electrical infrastructure, an exterior structural support rack, refrigerant detection and exhaust systems, replacement of a High Temperature Hot Water (HTHW) burner, and miscellaneous site and architectural improvements. A pre-bid walkthrough was scheduled for July 2, 2026, at 10:00 AM at the SBA Conference Room on the SUNY Albany campus, with bids due on July 22, 2026, at 2:00 PM.