Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replace ER AHU Brooklyn Campus. Provide all necessary labor and material to complete the Replacement and refurbishing of the HVAC equipment includes the replacement of the packaged AHU, refurbishing and upgrade the exhaust fans, replacement of the reheat system entirely, Heat exchanger, Pumps, CV boxes and piping in accordance with the attached manufacturer specifications and the VA specifications. This work shall include but is not limited to all necessary labor and Material to perform all Mechanical, electrical, Plumbing and other related trade work for a complete restoration and functional system. Provide and install all new digital control wiring system interlocked with the exhaust system, the space temperature and the Honeywell front end. Exhaust Fans Refurbish existing exhaust fans, EF1 at 15,270 CFM, EF2 at 1040 CFM, and EF3 at 1335 CFM, replace existing motors with equal HP and RPM, Install new fabric & sealant on the ductwork seams. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The U.S. Department of Veterans Affairs (VISN 2) solicits contractors to replace and refurbish the Emergency Room Air Handling Unit (AHU) at the Brooklyn Campus, including installation of a temporary HVAC unit, replacement of the packaged AHU, upgrades to exhaust fans and the reheat system, and related mechanical, electrical, and plumbing work. The project requires compliance with VA design guidelines, OSHA and NFPA safety standards, mandated walkthroughs, and use of the VISN 2 Autodesk Build (ACC) project platform; performance period is 240 calendar days. Project documents (drawings and master specifications) are attached on the official SAM.gov posting and the contracting officer point of contact is Gail E Hill (gail.hill@va.gov).
Posted Date
Dec 11, 2025
Due Date
Jan 19, 2026
Release: Dec 11, 2025
Close: Jan 19, 2026
The U.S. Department of Veterans Affairs (VISN 2) solicits contractors to replace and refurbish the Emergency Room Air Handling Unit (AHU) at the Brooklyn Campus, including installation of a temporary HVAC unit, replacement of the packaged AHU, upgrades to exhaust fans and the reheat system, and related mechanical, electrical, and plumbing work. The project requires compliance with VA design guidelines, OSHA and NFPA safety standards, mandated walkthroughs, and use of the VISN 2 Autodesk Build (ACC) project platform; performance period is 240 calendar days. Project documents (drawings and master specifications) are attached on the official SAM.gov posting and the contracting officer point of contact is Gail E Hill (gail.hill@va.gov).
AvailableThe Department of Veterans Affairs (VHA) solicits contractors to replace and refurbish the Emergency Room Air Handling Unit and related HVAC equipment at the Brooklyn VA Medical Center, including installation of a temporary ~100-ton HVAC unit, replacement of the packaged AHU, refurbishment of exhaust fans, reheat system, heat exchanger, pumps, and constant volume boxes. The procurement requires compliance with VA specifications, OSHA and NFPA safety standards, Davis-Bacon wage requirements, and use of VISN 2’s Autodesk Build construction management platform; the performance period is 240 calendar days. A mandatory site walkthrough is required and the solicitation is set as an active federal solicitation on SAM.gov with proposals due Jan 9, 2026.
Posted Date
Dec 11, 2025
Due Date
Jan 9, 2026
Release: Dec 11, 2025
Close: Jan 9, 2026
Work include repair/replace portions of the main campus sewer line.
Posted Date
Nov 28, 2025
Due Date
Dec 23, 2025
Release: Nov 28, 2025
Close: Dec 23, 2025
Work include repair/replace portions of the main campus sewer line.
AvailableIndiana University is requesting quotes for owner-purchased mechanical equipment to support the Engineering Science and Technology building (project IN072) at its Indianapolis campus. The scope centers on supplying equipment associated with Air Handling Unit 0 East (AHU 0 East) as owner-furnished materials. Bids are due January 8, 2026 at 2:00 PM Eastern Time via the Indiana University Plan Room.
Posted Date
-
Due Date
Jan 8, 2026
Release: -
Close: Jan 8, 2026
Indiana University is requesting quotes for owner-purchased mechanical equipment to support the Engineering Science and Technology building (project IN072) at its Indianapolis campus. The scope centers on supplying equipment associated with Air Handling Unit 0 East (AHU 0 East) as owner-furnished materials. Bids are due January 8, 2026 at 2:00 PM Eastern Time via the Indiana University Plan Room.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Department of Veterans Affairs (VHA) solicits contractors to replace and refurbish the Emergency Room Air Handling Unit and related HVAC equipment at the Brooklyn VA Medical Center, including installation of a temporary ~100-ton HVAC unit, replacement of the packaged AHU, refurbishment of exhaust fans, reheat system, heat exchanger, pumps, and constant volume boxes. The procurement requires compliance with VA specifications, OSHA and NFPA safety standards, Davis-Bacon wage requirements, and use of VISN 2’s Autodesk Build construction management platform; the performance period is 240 calendar days. A mandatory site walkthrough is required and the solicitation is set as an active federal solicitation on SAM.gov with proposals due Jan 9, 2026.