Summary
Provide labor and material to demo and replace the existing baltimore air cool tower model #fxt 130 with new air cool tower with same capable required products to perform with existing geo hvac system, o demo and reconnect all required piping from the existing tower piping and reconnect to the new tower system, demo existing fan motor control and replace with new fan motor control for the cooling tower, disconnect and or demo electrical conduit, wiring, breakers and or switches and install new conduit, wiring, breakers and switches to accommodate new cooling tower and fan motor, demo existing piping from existing reservoir tank in basement and re pipe new piping, valves and float on existing tank.