Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consist of 840 CY of earth excavation, 42 CY of rock excavation, 290 CY of channel excavation - earth, 65 CY of excavation and reuse of existing channel bottom material, 405 ton of disposal of controlled materials, 195 LF of cut bituminous concrete pavement, 1290 CY of structure excavation - earth (excluding cofferdam and dewatering), 417 LF of cofferdam and dewatering, 146 CY of granular fill, 580 CY of pervious structure backfill, 500 LF of sedimentation control system, 7 EA of sediment control system at catch basin, 24 LF of sawing and sealing joints, 233 LF of gutter line sealing for bridges. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Release: Dec 5, 2025
Close: Dec 15, 2025
Road & bridge materials and tires.
The Project includes the following Work: Onion River Road, Bridge 27 – Install temporary bypass road, remove temporary bridge, demolish old bridge, installation of new bridge (95’ clear span, NEDBT40 precast superstructure on integral abutments supported by driven h-piles), rock armoring, roadway construction and associated work. Sass Ave, Bridge 17 – Demolish old bridge, installation of new bridge (75’ clear span, NEXT36D precast superstructure on integral abutments supported by driven h-piles), rock armoring, roadway construction, remove temporary bridge, and associated work.
Posted Date
Nov 12, 2025
Due Date
Dec 19, 2025
Release: Nov 12, 2025
Close: Dec 19, 2025
The Project includes the following Work: Onion River Road, Bridge 27 – Install temporary bypass road, remove temporary bridge, demolish old bridge, installation of new bridge (95’ clear span, NEDBT40 precast superstructure on integral abutments supported by driven h-piles), rock armoring, roadway construction and associated work. Sass Ave, Bridge 17 – Demolish old bridge, installation of new bridge (75’ clear span, NEXT36D precast superstructure on integral abutments supported by driven h-piles), rock armoring, roadway construction, remove temporary bridge, and associated work.
AvailableThe Project includes the following Work: Cassady Road, Bridge 22 – Demolish old bridge, installation of new bridge (85’ clear span, NEDBT precast superstructure on integral abutments supported by driven h-piles), rock armoring, roadway construction, remove temporary bridge, and associated wor.
Posted Date
Nov 12, 2025
Due Date
Dec 19, 2025
Release: Nov 12, 2025
Close: Dec 19, 2025
The Project includes the following Work: Cassady Road, Bridge 22 – Demolish old bridge, installation of new bridge (85’ clear span, NEDBT precast superstructure on integral abutments supported by driven h-piles), rock armoring, roadway construction, remove temporary bridge, and associated wor.
AvailablePearl River County, Mississippi seeks proposals for bridge repair on Holden Road under the State Aid Bridge Program Project No. SABP-55(01). The project includes mobilization, clearing, grubbing, and various bridge-specific tasks such as cleaning and sealing joints, structural concrete work, and maintenance painting. The contract will be awarded to the lowest qualified bidder based on published quantities, with a contract time of 45 working days.
Posted Date
Nov 12, 2025
Due Date
Dec 17, 2025
Release: Nov 12, 2025
Close: Dec 17, 2025
Pearl River County, Mississippi seeks proposals for bridge repair on Holden Road under the State Aid Bridge Program Project No. SABP-55(01). The project includes mobilization, clearing, grubbing, and various bridge-specific tasks such as cleaning and sealing joints, structural concrete work, and maintenance painting. The contract will be awarded to the lowest qualified bidder based on published quantities, with a contract time of 45 working days.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis