Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Town of Marshfield
The Project includes the following Work: Onion River Road, Bridge 27 β Install temporary bypass road, remove temporary bridge, demolish old bridge, installation of new bridge (95β clear span, NEDBT40 precast superstructure on integral abutments supported by driven h-piles), rock armoring, roadway construction and associated work. Sass Ave, Bridge 17 β Demolish old bridge, installation of new bridge (75β clear span, NEXT36D precast superstructure on integral abutments supported by driven h-piles), rock armoring, roadway construction, remove temporary bridge, and associated work.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Cole County
Work includes removals, clearing and grubbing, grading, excavating, bridge construction, asphalt pavement, guardrail, rock blanket, pavement marking, seeding and mulching, erosion control and other miscellaneous work necessary to remove and replace the bridge road bridge. Also includes 3,920 SY of 6" depth subgrade compaction; 125 SY of bridge approach slab (minor); 958 LF of MGS guardrail; 1,486 LF of permanent fence; see attached file.
Posted Date
Oct 27, 2025
Due Date
Nov 21, 2025
Release: Oct 27, 2025
Cole County
Close: Nov 21, 2025
Work includes removals, clearing and grubbing, grading, excavating, bridge construction, asphalt pavement, guardrail, rock blanket, pavement marking, seeding and mulching, erosion control and other miscellaneous work necessary to remove and replace the bridge road bridge. Also includes 3,920 SY of 6" depth subgrade compaction; 125 SY of bridge approach slab (minor); 958 LF of MGS guardrail; 1,486 LF of permanent fence; see attached file.
AvailableCarter County
Carter County Government seeks proposals for immediate rapid services for repairs to Estep Bridge over Doe River. Proposers must demonstrate experience in major road repairs and compliance with FEMA regulations. Evaluation criteria include quality of repair plan, experience, resources, past performance, and price.
Posted Date
-
Due Date
Nov 24, 2025
Carter County
Close: Nov 24, 2025
Carter County Government seeks proposals for immediate rapid services for repairs to Estep Bridge over Doe River. Proposers must demonstrate experience in major road repairs and compliance with FEMA regulations. Evaluation criteria include quality of repair plan, experience, resources, past performance, and price.
AvailablePearl River County
Pearl River County, Mississippi seeks proposals for bridge repair on Holden Road under the State Aid Bridge Program Project No. SABP-55(01). The project includes mobilization, clearing, grubbing, and various bridge-specific tasks such as cleaning and sealing joints, structural concrete work, and maintenance painting. The contract will be awarded to the lowest qualified bidder based on published quantities, with a contract time of 45 working days.
Posted Date
Nov 12, 2025
Due Date
Dec 17, 2025
Release: Nov 12, 2025
Pearl River County
Close: Dec 17, 2025
Pearl River County, Mississippi seeks proposals for bridge repair on Holden Road under the State Aid Bridge Program Project No. SABP-55(01). The project includes mobilization, clearing, grubbing, and various bridge-specific tasks such as cleaning and sealing joints, structural concrete work, and maintenance painting. The contract will be awarded to the lowest qualified bidder based on published quantities, with a contract time of 45 working days.
AvailableCity of Palm Springs
Work consists of widening the bridge from a 4-lane arterial to a 6-lane arterial, with three lanes in each direction. The project includes seismic retrofitting, installation of new bridge barriers, bridge supports within the channel, and the addition of a 5-foot sidewalk on the north side and a 10-foot-wide multipurpose trail with a physical barrier for bicyclists on the south side. Includes comprehensive construction management services for the Ramon road bridge at whitewater river project. This includes developing project staging and traffic control plans, implementing a quality assurance program (including materials testing and inspection), reviewing construction surveying, ensuring environmental compliance, and conducting public outreach.
Posted Date
Oct 30, 2025
Due Date
Dec 1, 2025
Release: Oct 30, 2025
City of Palm Springs
Close: Dec 1, 2025
Work consists of widening the bridge from a 4-lane arterial to a 6-lane arterial, with three lanes in each direction. The project includes seismic retrofitting, installation of new bridge barriers, bridge supports within the channel, and the addition of a 5-foot sidewalk on the north side and a 10-foot-wide multipurpose trail with a physical barrier for bicyclists on the south side. Includes comprehensive construction management services for the Ramon road bridge at whitewater river project. This includes developing project staging and traffic control plans, implementing a quality assurance program (including materials testing and inspection), reviewing construction surveying, ensuring environmental compliance, and conducting public outreach.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis