Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Repairs to a 87.5’ x 30’ continuous concrete slab bridge and bridge approaches.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Replacement of a 45’ long by 30.5’ wide continuous concrete slab bridge.
Posted Date
Jan 10, 2026
Due Date
Feb 9, 2026
Release: Jan 10, 2026
Close: Feb 9, 2026
Replacement of a 45’ long by 30.5’ wide continuous concrete slab bridge.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Bridge and approaches.
Posted Date
Jan 21, 2026
Due Date
Feb 12, 2026
Release: Jan 21, 2026
Close: Feb 12, 2026
Bridge and approaches.
AvailableConstruction of 0.108 miles of bridge and approaches on COUNTY ROAD 4204.
Posted Date
Jan 9, 2026
Due Date
Feb 17, 2026
Release: Jan 9, 2026
Close: Feb 17, 2026
Construction of 0.108 miles of bridge and approaches on COUNTY ROAD 4204.
AvailableWork includes 18 EA. Jack and remove existing bearings; 775 ea. Concrete median, type SM-6.12 (special); 793 SY bridge deck grooving (longitudinal); 8 EA. Guardrail reflectors, type a; 5,656' paint pavement marking - line 4"; 2,907' pavement marking blackout tape, 5"; 150' steel plate beam guardrail, type a, 6' posts; 2,235 SF concrete median surface, 4"; 30 SF structural repair of concrete (depth greater than 5"); 1,008 SY bridge deck fly ash or GGBF concrete overlay, 2 1/4".
Posted Date
Jan 21, 2026
Due Date
Feb 27, 2026
Release: Jan 21, 2026
Close: Feb 27, 2026
Work includes 18 EA. Jack and remove existing bearings; 775 ea. Concrete median, type SM-6.12 (special); 793 SY bridge deck grooving (longitudinal); 8 EA. Guardrail reflectors, type a; 5,656' paint pavement marking - line 4"; 2,907' pavement marking blackout tape, 5"; 150' steel plate beam guardrail, type a, 6' posts; 2,235 SF concrete median surface, 4"; 30 SF structural repair of concrete (depth greater than 5"); 1,008 SY bridge deck fly ash or GGBF concrete overlay, 2 1/4".
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →