Summary
Work includes ROADWAY ITEMS: ǪUANTITY UNIT Mobilization 1.000 LS, Clearing and Grubbing 1.000 LS Unclassified Excavation (FM) 350.000 CY, Channel Excavation (FM) 1,960.000 CY, Excess Excavation (FM) 265.000 CY Crushed Stone 610 800.000 TON, Right-of-Way Markers (Type I) 6.000 EA, Maintenance of Traffic 1.000 LS Additional Construction Signs 0.000 SF, Reflectorized Traffic Object Marker (Encapsulated Lens) (Type 3) 4.000 EA EROSION CONTROL ITEMS: ǪUANTITY UNIT
Agricultural Limestone 2.000 TON Commercial Fertilizer (13-13-13) 1.000 TON Seeding 1.000 AC Vegetative Materials for Mulch 3.000 TON Solid Sodding 200.000 SY Temporary Silt Fence (Type II) (AOS 0.15-0.84) 950.000 LF Erosion Mat 380.000 SY Wattles, 20" 200.000 LF Loose Riprap, 200 Lb. 100.000 TON
Geotextile under Bridge Abutment Non-Woven, Type V, AOS <0.43 100.000 SY Geotextile under Riprap Non-Woven, Type V, AOS <0.43 200.000 SY BRIDGE ITEMS: ǪUANTITY UNIT Test Pile, 14" Prestressed Concrete 2.000 EA Conventional Static Pile Load Test 0.000 EA 14” Prestressed Concrete Piling 2,070.000 LF
18” Preformed Pile Hole 480.000 LF Bridge Concrete, Class "AA" 229.490 CY 40' Prestressed Concrete Beam, Type 1+2 397.500 LF 60' Prestressed Concrete Beam, Type III 597.500 LF
Reinforcement 40,269.000 LB Concrete Railing 400.000 LF
Loose Riprap, 300 Lb. 664.000 TON Geotextile under Riprap Non-Woven, Type V, AOS <0.43 1,662.000 SY.