School DistrictUT
Jul 20, 2026
Closes
Aug 10, 2026
Mount Pleasant Elementary School Boiler Replacement (Request for Proposals)
Work consists of provide a complete turnkey replacement of the existing hydronic heating boiler system. The project includes removal of existing equipment, installation of two high-efficiency condensing boilers, associated mechanical, electrical, venting, controls, bas integration, startup, commissioning, training, and warranty documentation.