University Of Quebec at Montreal
Higher EducationQC
Posted
Sep 24, 2026
Nov 18, 2026
Mise à niveau de la piscine et des infrastructures associées au Centre sportif
UQAM is procuring construction services to upgrade the pool and associated infrastructure at its Centre sportif, addressing structural, finishing and electromechanical deficiencies and replacing end-of-life systems. The scope includes demolition and reconstruction works, pool filling and repairs, new filtration and ventilation systems, replacement of finishes and lighting, full replacement of domestic water and drainage networks on level S-3, installation of a rooftop unit and related structural and roofing works, plus complete reconfiguration of adjacent locker rooms including an inclusive locker room and team locker rooms. The contractor must maintain building occupant access and safety, follow shared elevator rules, provide temporary protections, and may be required to perform work outside normal occupancy hours for service interruptions.
