Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes construction of the remote well no. 1 and water supply plant no. 1 - phase 4.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Construction of the wastewater treatment plant no. 1 - Phase 1 (0.15 MGD).
Posted Date
Dec 26, 2025
Due Date
Jan 22, 2026
Release: Dec 26, 2025
Close: Jan 22, 2026
Construction of the wastewater treatment plant no. 1 - Phase 1 (0.15 MGD).
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Northwest Harris County Municipal Utility District No. 10 is soliciting bids to expand its existing .995 MGD wastewater treatment plant to 1.3 MGD. The work includes demolition, installation of new piping and valves, construction of new aeration basins and aerobic digester basins, and equipment installation (including a Neuros NX75S-C070 turbo blower). Bids are to be submitted electronically with a bid opening on 2026-01-23 at 10:00 AM CST; a non-mandatory pre-bid meeting is scheduled for 2026-01-07 at 10:00 AM.
Posted Date
Dec 28, 2025
Due Date
Jan 23, 2026
Release: Dec 28, 2025
Close: Jan 23, 2026
Northwest Harris County Municipal Utility District No. 10 is soliciting bids to expand its existing .995 MGD wastewater treatment plant to 1.3 MGD. The work includes demolition, installation of new piping and valves, construction of new aeration basins and aerobic digester basins, and equipment installation (including a Neuros NX75S-C070 turbo blower). Bids are to be submitted electronically with a bid opening on 2026-01-23 at 10:00 AM CST; a non-mandatory pre-bid meeting is scheduled for 2026-01-07 at 10:00 AM.
AvailableProcure estimated costs for drilling contracting services. Bid proposal is to replace two type 1 wells (well #9 & well #10).
Posted Date
Dec 29, 2025
Due Date
Jan 26, 2026
Release: Dec 29, 2025
Close: Jan 26, 2026
Procure estimated costs for drilling contracting services. Bid proposal is to replace two type 1 wells (well #9 & well #10).
AvailableRelease: Dec 1, 2025
Close: Jan 15, 2026
Project include water treatment plant.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →