Summary
The City of Sugar Land is seeking a contractor to modify and rehabilitate its existing Surface Water Treatment Plant (Surface Water Treatment Plant Rehab Phase 1). The scope includes chemical metering and transfer pump improvements, a chlorine dioxide system, membrane building piping replacement, chemical protective coating, and associated electrical, instrumentation, and control improvements; the contractor will be responsible for mobilization, bonds, and insurance. The project duration is 640 calendar days and the solicitation is an RFP open 2026-07-01 through 2026-08-06, with procurement documents available on the City’s procurement portal.