Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Relocation of approx 160 LF of 12" domestic water pipeline inside Caltrans right-of-way to accommodate the Interstate 5 freeway widening. The proposed alignment will place the 12" domestic water pipeline on the 1 and 2 northbound lanes of Sand Canyon Avenue and will maintain 15 feet of separation from the proposed pile. The proposed work also includes the abatement of the existing asbestos cement pipe.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Water supply pipeline improvement.
Posted Date
Jan 3, 2026
Due Date
Jan 27, 2026
Release: Jan 3, 2026
Close: Jan 27, 2026
Water supply pipeline improvement.
AvailableWork includes the installation of approx. 18,500' of water reuse pipelines from the city wastewater treatment plant, sizes ranging from 6" to 12". In addition to the water reuse pipeline, this project also includes the reconfiguration of the mall entrance drives, by closing in certain entrances as shown in the plans. 1 ls mobilization (not to exceed 3% of total bid), complete in place, the sum of; 1 ls traffic control and regulation, complete in place, the sum of; 1 ls critical investigation work (includes locating existing underground utilities and pipelines as needed to facilitate water line construction), complete in place, the sum of; 52 ea inlet protection barrier, complete in place, the sum of. See attached file.
Posted Date
Dec 19, 2025
Due Date
Jan 15, 2026
Release: Dec 19, 2025
Close: Jan 15, 2026
Work includes the installation of approx. 18,500' of water reuse pipelines from the city wastewater treatment plant, sizes ranging from 6" to 12". In addition to the water reuse pipeline, this project also includes the reconfiguration of the mall entrance drives, by closing in certain entrances as shown in the plans. 1 ls mobilization (not to exceed 3% of total bid), complete in place, the sum of; 1 ls traffic control and regulation, complete in place, the sum of; 1 ls critical investigation work (includes locating existing underground utilities and pipelines as needed to facilitate water line construction), complete in place, the sum of; 52 ea inlet protection barrier, complete in place, the sum of. See attached file.
AvailableRFP for Water Main Relocation services.
Posted Date
Dec 29, 2025
Due Date
Jan 23, 2026
Release: Dec 29, 2025
Close: Jan 23, 2026
RFP for Water Main Relocation services.
AvailableKaty Management District No. 1 is soliciting contractors to install approximately 18,500 feet of water reuse pipeline (6"–12") in and around Katy, Texas across five segments, including reconfiguration of certain mall entrance drives. Bidders must provide a bid bond (or certified check) of at least 2% of the total bid, submit bids on provided forms and include required Texas Ethics Commission Form 1295; a virtual pre-bid is scheduled for 2026-01-08 and bid opening is scheduled for 2026-01-15 at City of Katy City Hall. Project documents (Project Manual and Project Drawings, both “Issued for Bid”) were posted to the planroom on 2025-12-18 and require sign-in to download.
Posted Date
-
Due Date
Jan 15, 2026
Release: -
Close: Jan 15, 2026
Katy Management District No. 1 is soliciting contractors to install approximately 18,500 feet of water reuse pipeline (6"–12") in and around Katy, Texas across five segments, including reconfiguration of certain mall entrance drives. Bidders must provide a bid bond (or certified check) of at least 2% of the total bid, submit bids on provided forms and include required Texas Ethics Commission Form 1295; a virtual pre-bid is scheduled for 2026-01-08 and bid opening is scheduled for 2026-01-15 at City of Katy City Hall. Project documents (Project Manual and Project Drawings, both “Issued for Bid”) were posted to the planroom on 2025-12-18 and require sign-in to download.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis