Summary
Work includes Relocation of (1) existing portable building located on this site to a new location on this site. This would include disconnection of and reconnection of utilities. Site coordination work for the installation of (4) leased buildings. Buildings to be set and placed by the leasing company. Connection of utilities to buildings. Installation of underground utilities, to include water, wastewater, power and low voltage, to all (5) buildings. Installation of low voltage to interior of buildings, to include fire alarm, intrusion and data. Minor alternations of Units D1, D2, D3, D4 and D5.Installation of ramp, platform and fencing.