Roads Program Capital Improvement Project Package 1
Work includes 10 EA portable changeable message signs; 14 EA construction funding signs; 1 LS erosion and dust control bmps; 1 LS pothole existing utilities; 1 LS video sewer and storm drain video; 2,398 CY roadway excavation (f); 53,082 sy cold plane asphalt concrete pavement; 231 CY unsuitable material; 4,905 LF remove concrete curb & gutter; 15,546 SF remove concrete flatwork; 1 EA remove water curb stop valve box and cover; 2 EA remove tree/hedge; 14,905 ton hma (type a); 37,125 SY full depth reclamation-cement; 1,126 ton cement (full-depth reclamation- cement); 2,426 LF slurry backfill over shallow utility. See attached file.