CountyNJ
Posted
Oct 16, 2026
Nov 5, 2026
Rehabilitation of County Bridge No. F1306 Rippling Brook Way Over Tributary of Mine Brook RFP
Installation, maintenance, and removal of traffic control devices associated with the vehicular detour proposed with this project. Installation, maintenance, and removal of soil erosion and sediment control devices. Restoration of structural capacity of structure by replacing the existing invert and other repairs of the culvert. Restoration of scoured streambed and embankments. Installation of new scour countermeasures to extend service life of structure. Construction of approximately 200 feet of roadway, installation of beam guide rail and road striping.
