Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This work includes approx. 17,500 LF of 1/C 8 5 KV airfield cable in existing conduit; 17,500 LF of 1/C 6 bare counterpoise, direct bury; 100 LF of directional bore; 1,000 LF of electrical conduit, 1-way, 2"; 4 EA of new led base mounted taxiway edge light on new base; 142 EA of remove base mounted taxiway edge light fixture; 142 EA of new led base mounted taxiway edge light on new base.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project will replace runway and taxiway lighting and replace and relocate REILs and PAPIs. This will include new conduit, base cans, wiring, a new vault enclosure and regulator. Replacing the beacon light is an alternate bid item.
Posted Date
Jun 9, 2025
Due Date
Jul 8, 2026
Release: Jun 9, 2025
Close: Jul 8, 2026
Project will replace runway and taxiway lighting and replace and relocate REILs and PAPIs. This will include new conduit, base cans, wiring, a new vault enclosure and regulator. Replacing the beacon light is an alternate bid item.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Rehabilitation of Taxiway A airfield lighting system. Includes the removal and replacement of existing stake and base mounted lights with new medium intensity taxiway lights on new and existing bases. Removal and replacement of existing airfield lighting circuit, including counterpoise. Vault improvements.
Posted Date
Jan 28, 2026
Due Date
Feb 17, 2026
Release: Jan 28, 2026
Close: Feb 17, 2026
Rehabilitation of Taxiway A airfield lighting system. Includes the removal and replacement of existing stake and base mounted lights with new medium intensity taxiway lights on new and existing bases. Removal and replacement of existing airfield lighting circuit, including counterpoise. Vault improvements.
AvailableLincoln County and the Lincoln County Regional Airport are soliciting formal sealed bids for rehabilitation and upgrades to the airport’s runway and taxiway lighting systems. A mandatory pre‑bid meeting is scheduled for February 10, 2026, with bidding documents available through the official plan room at Richa Graphics and other listed plan rooms. Bids are due by 2:00 PM local time on March 3, 2026, at the Lincoln County Manager’s Office in Lincolnton, NC.
Posted Date
Jan 30, 2026
Due Date
Mar 3, 2026
Release: Jan 30, 2026
Close: Mar 3, 2026
Lincoln County and the Lincoln County Regional Airport are soliciting formal sealed bids for rehabilitation and upgrades to the airport’s runway and taxiway lighting systems. A mandatory pre‑bid meeting is scheduled for February 10, 2026, with bidding documents available through the official plan room at Richa Graphics and other listed plan rooms. Bids are due by 2:00 PM local time on March 3, 2026, at the Lincoln County Manager’s Office in Lincolnton, NC.
AvailableAsphalt concrete pavement reconstruction of Taxiway C and PCC pavement reconstruction adjacent to Hardstands A–E on the South Ramp, including asphalt overlay, storm drain replacement and repairs, 12-inch waterline replacement, and airfield electrical and lighting revisions.
Posted Date
Jan 29, 2026
Due Date
Mar 23, 2026
Release: Jan 29, 2026
Close: Mar 23, 2026
Asphalt concrete pavement reconstruction of Taxiway C and PCC pavement reconstruction adjacent to Hardstands A–E on the South Ramp, including asphalt overlay, storm drain replacement and repairs, 12-inch waterline replacement, and airfield electrical and lighting revisions.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →