Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Barkley Regional Airport
This project generally consists of the replacement of the airfield lighting vault and all associated equipment, homeruns, conduits, rotating beacon and tower, back-up generator, and other airfield equipment, as well as the demolition and off-site disposal of the existing airfield lighting vault and associated equipment and supporting facilities. A new power feed to serve the new vault location will be needed and coordinated with the local electric utility provider. In addition, the project scope of work includes the replacement of the existing Runway 14/32 medium -intensity runway edge lighting (MIRL) system with a new system utilizing light-emitting diode (LED) technology, as well as the replacement of the existing Taxiway Alpha, Charlie, Foxtrot, & Whiskey medium-intensity taxiway edge lighting (MITL) systems with new systems utilizing light- emitting diode (LED) technology. See attached file.
Posted Date
Jun 12, 2026
Due Date
Jul 10, 2026
Release: Jun 12, 2026
Barkley Regional Airport
Close: Jul 10, 2026
This project generally consists of the replacement of the airfield lighting vault and all associated equipment, homeruns, conduits, rotating beacon and tower, back-up generator, and other airfield equipment, as well as the demolition and off-site disposal of the existing airfield lighting vault and associated equipment and supporting facilities. A new power feed to serve the new vault location will be needed and coordinated with the local electric utility provider. In addition, the project scope of work includes the replacement of the existing Runway 14/32 medium -intensity runway edge lighting (MIRL) system with a new system utilizing light-emitting diode (LED) technology, as well as the replacement of the existing Taxiway Alpha, Charlie, Foxtrot, & Whiskey medium-intensity taxiway edge lighting (MITL) systems with new systems utilizing light- emitting diode (LED) technology. See attached file.
AvailableBarkley Regional Airport
Airport fuel storage facility improvements. Project generally consists of the replacement of the airport's fuel storage facilities with a new jet a / av gas fuel storage facility, a new self-service av gas fuel storage and dispensing system, a new diesel fuel storage and dispensing system, and a new automotive gas (mo gas) fuel storage and dispensing system, including associated fuel management systems. The project also includes the closure and demolition of the existing aviation fuel storage system, once the new facilities are operational, as well as restoration of the demolition site. The establishment of these new facilities will require several complimentary sitework improvements including new access drives, existing roadway modifications, existing apron pavement modifications, new fencing, and new flood lighting. These sitework improvements will include, but are not limited to, the following disciplines of work: demolition, grading and drainage improvements, bituminous pavement construction, concrete pavement and curbing construction, chain-link fencing and manual access control measures, and pavement markings, as well as traffic control and erosion control measures.
Posted Date
Nov 15, 2024
Due Date
Feb 21, 2025
Release: Nov 15, 2024
Barkley Regional Airport
Close: Feb 21, 2025
Airport fuel storage facility improvements. Project generally consists of the replacement of the airport's fuel storage facilities with a new jet a / av gas fuel storage facility, a new self-service av gas fuel storage and dispensing system, a new diesel fuel storage and dispensing system, and a new automotive gas (mo gas) fuel storage and dispensing system, including associated fuel management systems. The project also includes the closure and demolition of the existing aviation fuel storage system, once the new facilities are operational, as well as restoration of the demolition site. The establishment of these new facilities will require several complimentary sitework improvements including new access drives, existing roadway modifications, existing apron pavement modifications, new fencing, and new flood lighting. These sitework improvements will include, but are not limited to, the following disciplines of work: demolition, grading and drainage improvements, bituminous pavement construction, concrete pavement and curbing construction, chain-link fencing and manual access control measures, and pavement markings, as well as traffic control and erosion control measures.
Barkley Regional Airport
Provide management, operation and marketing of the products, services and facilities for the fixed base operation (fbo).
Posted Date
Aug 30, 2024
Due Date
Oct 31, 2024
Release: Aug 30, 2024
Barkley Regional Airport
Close: Oct 31, 2024
Provide management, operation and marketing of the products, services and facilities for the fixed base operation (fbo).
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge