Wood River Drainage And Levee District
The project consists of constructing: providing new 36" slide gate at four (4) existing gate structures. Alternative bid #1 including addition of toe plates to the existing railing at gate structures 1, 2 and 3. Alternative bid #2 including removal of existing fence and installation of new railing and toe plates at gate structure 4. Alternative bid #3 including removal of existing grating and replacement with new grating at gate structures 1, 2, 3 and 4. Maintaining flow in existing sewers by bypass pumping or other means. Removing all debris and excess materials from project site generated by construction work.
bulk
zip
Release
Oct 01, 2024
Close
Oct 23, 2024