Summary
Work associated with proposed improvements is generally described as follows: Schedule A - South Terminal Apron Reconstruction and Expansion: The project includes demolition of approx. 10,000 SY of existing asphalt apron pavement and reconstructing with 7,200 SY of concrete pavement and 4,600 SY of asphalt pavement, along with associated airfield electrical and storm drainage improvements. Schedule B - North Terminal Apron Reconstruction and Expansion, Deice Apron Construction: The project includes demolition of approximately 4,600 SY of existing asphalt apron pavement and reconstructing with 5,100 SY of concrete pavement and 12,800 SY of asphalt pavement, along with associated airfield electrical and storm drainage improvements. Schedule C - Terminal Apron Pavement Maintenance: The project includes 21,500 LF of concrete joint sealant removal and replacement and 2,100 LF of concrete pavement spall repair as well as repairs to concrete drainage structures within the work area. Schedule D - North Cargo Apron Reconstruction: The project includes reconstruction of approx. 4,500 SY of existing taxilane pavement. Schedule E - South Apron Stormwater Improvements: The project includes removal and replacement of approx. 1,365 LF of Reinforced Concrete Pipe and 3,000 CY of excavation for a detention pond. Schedule F - Deicing Effluent Storage: The project includes installing a 50,000 gallon HDPE in-ground holding tank for deicing effluent with a tank level monitoring system and the installation of 250 LF of storm pipe.