Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Idaho Falls Power
Work associated with proposed improvements is generally described as follows: Schedule A - South Terminal Apron Reconstruction and Expansion: The project includes demolition of approx. 10,000 SY of existing asphalt apron pavement and reconstructing with 7,200 SY of concrete pavement and 4,600 SY of asphalt pavement, along with associated airfield electrical and storm drainage improvements. Schedule B - North Terminal Apron Reconstruction and Expansion, Deice Apron Construction: The project includes demolition of approximately 4,600 SY of existing asphalt apron pavement and reconstructing with 5,100 SY of concrete pavement and 12,800 SY of asphalt pavement, along with associated airfield electrical and storm drainage improvements. Schedule C - Terminal Apron Pavement Maintenance: The project includes 21,500 LF of concrete joint sealant removal and replacement and 2,100 LF of concrete pavement spall repair as well as repairs to concrete drainage structures within the work area. Schedule D - North Cargo Apron Reconstruction: The project includes reconstruction of approx. 4,500 SY of existing taxilane pavement. Schedule E - South Apron Stormwater Improvements: The project includes removal and replacement of approx. 1,365 LF of Reinforced Concrete Pipe and 3,000 CY of excavation for a detention pond. Schedule F - Deicing Effluent Storage: The project includes installing a 50,000 gallon HDPE in-ground holding tank for deicing effluent with a tank level monitoring system and the installation of 250 LF of storm pipe.
Posted Date
Mar 16, 2026
Due Date
Apr 1, 2026
Release: Mar 16, 2026
Idaho Falls Power
Close: Apr 1, 2026
Work associated with proposed improvements is generally described as follows: Schedule A - South Terminal Apron Reconstruction and Expansion: The project includes demolition of approx. 10,000 SY of existing asphalt apron pavement and reconstructing with 7,200 SY of concrete pavement and 4,600 SY of asphalt pavement, along with associated airfield electrical and storm drainage improvements. Schedule B - North Terminal Apron Reconstruction and Expansion, Deice Apron Construction: The project includes demolition of approximately 4,600 SY of existing asphalt apron pavement and reconstructing with 5,100 SY of concrete pavement and 12,800 SY of asphalt pavement, along with associated airfield electrical and storm drainage improvements. Schedule C - Terminal Apron Pavement Maintenance: The project includes 21,500 LF of concrete joint sealant removal and replacement and 2,100 LF of concrete pavement spall repair as well as repairs to concrete drainage structures within the work area. Schedule D - North Cargo Apron Reconstruction: The project includes reconstruction of approx. 4,500 SY of existing taxilane pavement. Schedule E - South Apron Stormwater Improvements: The project includes removal and replacement of approx. 1,365 LF of Reinforced Concrete Pipe and 3,000 CY of excavation for a detention pond. Schedule F - Deicing Effluent Storage: The project includes installing a 50,000 gallon HDPE in-ground holding tank for deicing effluent with a tank level monitoring system and the installation of 250 LF of storm pipe.
AvailableIdaho Falls Power
Idaho Falls Power is soliciting bids for the Downtown Alley Phases 2 & 3 construction project to install underground electrical and fiber optic conduit. The scope of work includes trenching, conduit and junction-box installation, vault installation, traffic control, and surface repair. A pre-bid meeting is scheduled for March 12, 2026, with final bids due at the Idaho Falls Power office by March 19, 2026.
Posted Date
Mar 4, 2026
Due Date
Mar 19, 2026
Release: Mar 4, 2026
Idaho Falls Power
Close: Mar 19, 2026
Idaho Falls Power is soliciting bids for the Downtown Alley Phases 2 & 3 construction project to install underground electrical and fiber optic conduit. The scope of work includes trenching, conduit and junction-box installation, vault installation, traffic control, and surface repair. A pre-bid meeting is scheduled for March 12, 2026, with final bids due at the Idaho Falls Power office by March 19, 2026.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Idaho Falls Regional Airport Administration Office
This document outlines Idaho Falls Power's commitment to providing low-cost, reliable electricity while meeting current and future energy and sustainability needs. It emphasizes responsible resource use and environmental practices to support social and economic development. The utility, currently reliant on hydropower and a Bonneville Power Administration (BPA) contract expiring in 2028, faces a changing energy landscape marked by market fluctuations, plant retirements, and significant customer growth. To address these challenges and maintain service goals, Idaho Falls Power is actively exploring additional energy resources for future planning.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Idaho Falls Regional Airport Administration Office's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database