Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of the disconnect and removal of the existing water booster system unit, the installation and re-connection of the new water booster system unit, and the disinfection and flushing of the water distribution system.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes cured in place lining of approx 4,780 LF of 8" to 16" sanitary sewer, and rehab and coating of 24 manholes.
Posted Date
Jan 15, 2026
Due Date
Feb 17, 2026
Release: Jan 15, 2026
Close: Feb 17, 2026
Work includes cured in place lining of approx 4,780 LF of 8" to 16" sanitary sewer, and rehab and coating of 24 manholes.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide construction services to rehabilitate the hurricane ridge public water system by replacing reservoir fill and distribution lines with high-density polyethylene (HDPE) pipe and associated valves; competently managing and disposing of asbestos cement pipe; inspecting, repairing, and re-coating the existing 100,000-gal. dual-chamber underground cast-in-place reinforced concrete reservoir; replacing the well pump control system; provide temporary water and sanitary services to existing facilities during construction; and restoring all surfaces disturbed by construction activities. Include additives/options to demolish and remove obsolete surface water infrastructure from the site; and add remote monitoring capability for key water system parameters.
Posted Date
Jan 13, 2026
Due Date
Feb 16, 2026
Release: Jan 13, 2026
Close: Feb 16, 2026
Provide construction services to rehabilitate the hurricane ridge public water system by replacing reservoir fill and distribution lines with high-density polyethylene (HDPE) pipe and associated valves; competently managing and disposing of asbestos cement pipe; inspecting, repairing, and re-coating the existing 100,000-gal. dual-chamber underground cast-in-place reinforced concrete reservoir; replacing the well pump control system; provide temporary water and sanitary services to existing facilities during construction; and restoring all surfaces disturbed by construction activities. Include additives/options to demolish and remove obsolete surface water infrastructure from the site; and add remote monitoring capability for key water system parameters.
AvailableThe Florida Fish and Wildlife Conservation Commission is seeking bids for the construction of five crushed rock parking spaces, one ADA-compliant parking space, a day use pavilion, information kiosk, asphalt driveway connection, and concrete sidewalk at Sandy Sprunt Day Use Area in Florida. Bidders are required to register in MyFloridaMarketPlace (MFMP), be registered with SunBiz, and provide contractor license evidence. Electronic plans and documents can be obtained by emailing a completed Confidentiality Exemption Form to Elbert.Orellana@myfwc.com or downloaded from the MFMP bid detail page.
Posted Date
Dec 11, 2025
Due Date
Feb 2, 2026
Release: Dec 11, 2025
Close: Feb 2, 2026
The Florida Fish and Wildlife Conservation Commission is seeking bids for the construction of five crushed rock parking spaces, one ADA-compliant parking space, a day use pavilion, information kiosk, asphalt driveway connection, and concrete sidewalk at Sandy Sprunt Day Use Area in Florida. Bidders are required to register in MyFloridaMarketPlace (MFMP), be registered with SunBiz, and provide contractor license evidence. Electronic plans and documents can be obtained by emailing a completed Confidentiality Exemption Form to Elbert.Orellana@myfwc.com or downloaded from the MFMP bid detail page.
AvailableThe National Park Service (Olympic National Park) seeks contractors to rehabilitate the Hurricane Ridge water system in Olympic National Park, Clallam County, WA. This is a Total Small Business set-aside under NAICS 237110 (Water and Sewer Line and Related Structures Construction) for rehabilitation and maintenance of water supply facilities. The notice is a pre-solicitation posted 2026-01-13 with responses due 2026-02-17; interested vendors must be registered in SAM and have a valid UEI.
Posted Date
Jan 13, 2026
Due Date
Feb 17, 2026
Release: Jan 13, 2026
Close: Feb 17, 2026
The National Park Service (Olympic National Park) seeks contractors to rehabilitate the Hurricane Ridge water system in Olympic National Park, Clallam County, WA. This is a Total Small Business set-aside under NAICS 237110 (Water and Sewer Line and Related Structures Construction) for rehabilitation and maintenance of water supply facilities. The notice is a pre-solicitation posted 2026-01-13 with responses due 2026-02-17; interested vendors must be registered in SAM and have a valid UEI.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →