Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Installation of a force main using various methods to include open cut, horizontal directional drilling, jack and boring, and/or pipe bursting. Installation of air release/vacuum release valves, isolation valves, and manholes. Restoration to include paving, grassing and stabilization. System startup and performance testing. Construction of a new reuse water pump station. Preparation of record drawings for the pump station and the force main.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The County of San Bernardino (Department of Public Works - Solid Waste Management Division) is soliciting contractors to construct a Phase 1B liner system at the Landers Sanitary Landfill, including mobilization, excavation, installation of geosynthetic clay liners and geomembranes, drainage systems, and protective soil covers. The work includes substantial earthmoving (approx. 405,000 cubic yards of excavation) and installation of 285,000 sq ft of GCL, with performance to begin in April 2026 and completion within 180 working days from Notice to Proceed. Bidders must hold a valid California State Contractor 'A' license, register in the San Bernardino County ePro system, and provide bid security equal to 10% of the bid.
Posted Date
Dec 9, 2025
Due Date
Feb 3, 2026
Release: Dec 9, 2025
Close: Feb 3, 2026
The County of San Bernardino (Department of Public Works - Solid Waste Management Division) is soliciting contractors to construct a Phase 1B liner system at the Landers Sanitary Landfill, including mobilization, excavation, installation of geosynthetic clay liners and geomembranes, drainage systems, and protective soil covers. The work includes substantial earthmoving (approx. 405,000 cubic yards of excavation) and installation of 285,000 sq ft of GCL, with performance to begin in April 2026 and completion within 180 working days from Notice to Proceed. Bidders must hold a valid California State Contractor 'A' license, register in the San Bernardino County ePro system, and provide bid security equal to 10% of the bid.
AvailableProject consists of site demo/earthwork; site/cast in place concrete; masonry; structural steel supply and installation; millwork/casework supply and install; roofing/sheetmetal/soffit panels; joint sealants and waterproofing; doors and hardware supply/install; glass and glazing; drywall and acoustical; flooring and wall tile; painting; specialties supply and install; window treatments; fire protection; plumbing; HVAC; electrical/communications/fire alarm; landscape and irrigation; fencing; site utilities. See outside link.
Posted Date
Dec 18, 2025
Due Date
Jan 19, 2026
Release: Dec 18, 2025
Close: Jan 19, 2026
Project consists of site demo/earthwork; site/cast in place concrete; masonry; structural steel supply and installation; millwork/casework supply and install; roofing/sheetmetal/soffit panels; joint sealants and waterproofing; doors and hardware supply/install; glass and glazing; drywall and acoustical; flooring and wall tile; painting; specialties supply and install; window treatments; fire protection; plumbing; HVAC; electrical/communications/fire alarm; landscape and irrigation; fencing; site utilities. See outside link.
Provide wastewater system improvements that also includes 1 LS erosion control; 1 LS bypass pumping and temporary treatment during wastewater treatment facility improvements; 1 LS site earthwork and final grading. Includes grading for UV, operations building and associated piping; 1 LS gravel pavement. See outside link.
Posted Date
-
Due Date
Jan 14, 2026
Close: Jan 14, 2026
Provide wastewater system improvements that also includes 1 LS erosion control; 1 LS bypass pumping and temporary treatment during wastewater treatment facility improvements; 1 LS site earthwork and final grading. Includes grading for UV, operations building and associated piping; 1 LS gravel pavement. See outside link.
AvailableWork includes Contract 1B - 77,300 LF (approx.) of 2" to 12" water main and appurtenances 4 horizontal directional drills - 1,200 LF of fusible PVC 4" to 12" leonard road 400 gpm booster pump station.
Posted Date
Dec 17, 2025
Due Date
Jan 8, 2026
Release: Dec 17, 2025
Close: Jan 8, 2026
Work includes Contract 1B - 77,300 LF (approx.) of 2" to 12" water main and appurtenances 4 horizontal directional drills - 1,200 LF of fusible PVC 4" to 12" leonard road 400 gpm booster pump station.