Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of a 12" C-900 waterline and 14" HDPE Directional Bore.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This project consists of, but is not limited to: The Road Plymouth Switchbacks Repair and Clean Water Project consists of repairing and upgrading the eastern 1.95 miles of the Road, a State Forest Highway. The road serves as important access to Coolidge West State Forest for recreation and forest management activities as well as a valued travel corridor over the Green Mountains between the towns.
Posted Date
Dec 16, 2025
Due Date
Jan 16, 2026
Release: Dec 16, 2025
Close: Jan 16, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This project consists of, but is not limited to: The Road Plymouth Switchbacks Repair and Clean Water Project consists of repairing and upgrading the eastern 1.95 miles of the Road, a State Forest Highway. The road serves as important access to Coolidge West State Forest for recreation and forest management activities as well as a valued travel corridor over the Green Mountains between the towns.
The Vermont Department of Buildings and General Services seeks bids for the CCC Road Plymouth Switchbacks Repair and Clean Water Project to repair flood-damaged road sections and upgrade features to meet clean water quality standards. Work includes mobilization, erosion control, ditch and culvert repairs, road resurfacing, disposal of excess materials, and site restoration; the project is to be completed within an estimated 120 days. A mandatory pre‑bid/site visit is scheduled for 2025‑12‑22 and the successful bidder will be required to provide full bonding.
Posted Date
Dec 16, 2025
Due Date
Jan 16, 2026
Release: Dec 16, 2025
Close: Jan 16, 2026
The Vermont Department of Buildings and General Services seeks bids for the CCC Road Plymouth Switchbacks Repair and Clean Water Project to repair flood-damaged road sections and upgrade features to meet clean water quality standards. Work includes mobilization, erosion control, ditch and culvert repairs, road resurfacing, disposal of excess materials, and site restoration; the project is to be completed within an estimated 120 days. A mandatory pre‑bid/site visit is scheduled for 2025‑12‑22 and the successful bidder will be required to provide full bonding.
AvailableWest View Water Authority is soliciting separate, sealed proposals to replace existing cast iron water mains with new ductile iron and PE4710 pipe and appurtenances along Springfield Road, Shady Oak Road, and Shady Oak Circle in the Town of McCandless, Allegheny County, PA. Bids are due by 10:00 A.M., Tuesday, January 13, 2026, with a mandatory job showing at 9:00 A.M. on Tuesday, January 6, 2026, at the Authority’s Distribution Center. Plans/specifications are available to prequalified bidders at the Distribution Center; bids require a 10% bid bond and are subject to WVWA prequalification and standard Pennsylvania requirements.
Posted Date
-
Due Date
Jan 13, 2026
Close: Jan 13, 2026
West View Water Authority is soliciting separate, sealed proposals to replace existing cast iron water mains with new ductile iron and PE4710 pipe and appurtenances along Springfield Road, Shady Oak Road, and Shady Oak Circle in the Town of McCandless, Allegheny County, PA. Bids are due by 10:00 A.M., Tuesday, January 13, 2026, with a mandatory job showing at 9:00 A.M. on Tuesday, January 6, 2026, at the Authority’s Distribution Center. Plans/specifications are available to prequalified bidders at the Distribution Center; bids require a 10% bid bond and are subject to WVWA prequalification and standard Pennsylvania requirements.
AvailableThe State of Vermont (Buildings & General Services) is soliciting bids to repair the CCC Road Plymouth switchbacks and implement related Clean Water upgrades. The project includes site work and roadway improvements with a mandatory pre‑bid site meeting on December 22, 2025. Bids are due January 16, 2026 at 4:30 PM (ET).
Posted Date
Dec 16, 2025
Due Date
Jan 16, 2026
Release: Dec 16, 2025
Close: Jan 16, 2026
The State of Vermont (Buildings & General Services) is soliciting bids to repair the CCC Road Plymouth switchbacks and implement related Clean Water upgrades. The project includes site work and roadway improvements with a mandatory pre‑bid site meeting on December 22, 2025. Bids are due January 16, 2026 at 4:30 PM (ET).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →