Summary
Work generally consists of mobilization and demobilization; sheeting, shoring and bracing; implementation and maintenance of storm water pollution prevention measures; dewatering operations; installation of approx 150 LF of 8" HDPE pipe by open-cut construction; installation of approx 2068 LF of 8" HDPE pipe by horizontal direction drilling (HDD); tie-ins to existing recycled water facilities; installation of gate valves and combination air valve assemblies; installation of vehicular bollards, cutting, capping, and abandoning existing recycled water main; removal of existing valve boxes and risers; and all other associated work.