Summary
The work of this Contract generally includes, but is not necessarily limited to, the following: Removal and replacement of the entire Recreation Building HVAC system (all 4 existing zones) in accordance with Contract Plans inclusive of all work required to install new gas piping, ventilation ducts, condensers, etc; upgrading of electrical service needed to accommodate new system; construction of new roofing and wall vents as needed; installation of protective bollards for air conditioning condensers installed at grade; construction of new interior stairs; all building and exterior site restoration; and all other work necessary and incidental thereto.