Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Road reconstruction.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Replacement of approx. 3,000 LF of water main. The new water main will replace the existing cast iron main. This water main replacement includes replacement of associated valves, hydrants and service lines. Replacement will start at DeLorme Drive and extend north on Route 1 to the Cousins River bridge. The existing cast iron water mains on Route 1 will be abandoned in place. The materials furnished by Owner are indicated in the contract documents. The Contractor shall install materials furnished by the Owner. The project is in advance of proposed work by MaineDOT to extend the Beth Condon walking trail on the southerly shoulder of Route 1. The base bid is designed around replacement of water main via open cut installation. A bid alternate is included for water main installation via horizontal directional drill.
Posted Date
Jan 12, 2026
Due Date
Feb 12, 2026
Release: Jan 12, 2026
Close: Feb 12, 2026
Replacement of approx. 3,000 LF of water main. The new water main will replace the existing cast iron main. This water main replacement includes replacement of associated valves, hydrants and service lines. Replacement will start at DeLorme Drive and extend north on Route 1 to the Cousins River bridge. The existing cast iron water mains on Route 1 will be abandoned in place. The materials furnished by Owner are indicated in the contract documents. The Contractor shall install materials furnished by the Owner. The project is in advance of proposed work by MaineDOT to extend the Beth Condon walking trail on the southerly shoulder of Route 1. The base bid is designed around replacement of water main via open cut installation. A bid alternate is included for water main installation via horizontal directional drill.
AvailableRoadway and sidewalk rehabilitation for NYS Route 5, Main Street, including mill and overlay, new bicycle lanes, concrete sidewalk rehabilitation, crosswalks, curbing, drainage, utility work, landscaping, streetscape furnishings, signs, markings, traffic signals, lighting, electrical, blue light camera installation, and wayfinding signage.
Posted Date
Jan 7, 2026
Due Date
Feb 4, 2026
Release: Jan 7, 2026
Close: Feb 4, 2026
Roadway and sidewalk rehabilitation for NYS Route 5, Main Street, including mill and overlay, new bicycle lanes, concrete sidewalk rehabilitation, crosswalks, curbing, drainage, utility work, landscaping, streetscape furnishings, signs, markings, traffic signals, lighting, electrical, blue light camera installation, and wayfinding signage.
AvailableWork includes mill and overlay of existing roadway and reconfiguring of travel lanes, new bicycle lanes with porous asphalt at sidewalk level and concrete sidewalk rehabilitation, crosswalks, curbing, drainage, utility work, landscaping, streetscape furnishings, signs, markings, traffic signals, lighting, electrical, blue light camera installation and wayfinding signage.
Posted Date
Sep 26, 2025
Due Date
Feb 4, 2026
Release: Sep 26, 2025
Close: Feb 4, 2026
Work includes mill and overlay of existing roadway and reconfiguring of travel lanes, new bicycle lanes with porous asphalt at sidewalk level and concrete sidewalk rehabilitation, crosswalks, curbing, drainage, utility work, landscaping, streetscape furnishings, signs, markings, traffic signals, lighting, electrical, blue light camera installation and wayfinding signage.
AvailableReconstruction and resurfacing of NY Route 93 in the Village of Youngstown and Town of Porter.
Posted Date
-
Due Date
Feb 5, 2026
Close: Feb 5, 2026
Reconstruction and resurfacing of NY Route 93 in the Village of Youngstown and Town of Porter.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis