Summary
Improvements include maintaining the existing 2-lane roadway with open ditch drainage within the existing right-of-way (ROW) which spans 70 FT to 80 FT. It is proposed to reconstruct the 3" asphalt pavement, 8" black base course, 8" lime and or fly ash stabilized subgrade with flex base shoulders. Proposed typical sections include a 24’ wide road for the Mathis Road segment, with 2’ flex base berms. For Berry Lane and Penick Road, proposed typical sections include a 22’ wide roadway with 2’ flex base berms. The scope of work includes mill and overlay of both the Penick Road and Mathis Road bridges. Apart from this, the two bridges are to be maintained as is. The scope of work also includes a drainage study which focuses on providing enough conveyance in the ditches and culverts. The open ditch drainage is to be maintained, and regrading of existing ditches are proposed throughout the corridor. Traffic control, permanent signing and striping, and storm water pollution prevention are also included as part of the scope for this project.