Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Robstown Independent School District
Field House Renovation Project.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Town of Brookline
Renovation of the amory playground field house.
Posted Date
Aug 7, 2025
Due Date
Dec 3, 2025
Release: Aug 7, 2025
Town of Brookline
Close: Dec 3, 2025
Renovation of the amory playground field house.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Franklin County
The project consists of the renovation of a vacant, existing two-story (plus basement), wood-frame, single family detached residence and connected garage to create a workforce house.
Posted Date
Nov 4, 2025
Due Date
Nov 25, 2025
Release: Nov 4, 2025
Franklin County
Close: Nov 25, 2025
The project consists of the renovation of a vacant, existing two-story (plus basement), wood-frame, single family detached residence and connected garage to create a workforce house.
University Of Southern Indiana
The University of Southern Indiana seeks proposals for the renovation of the President's House, requiring all labor, equipment, and materials. Bidders must provide bid bonds, performance and payment bonds, and insurance certificates. A pre-bid meeting is scheduled, and plans are available online.
Posted Date
-
Due Date
Dec 4, 2025
Release: -
University Of Southern Indiana
Close: Dec 4, 2025
The University of Southern Indiana seeks proposals for the renovation of the President's House, requiring all labor, equipment, and materials. Bidders must provide bid bonds, performance and payment bonds, and insurance certificates. A pre-bid meeting is scheduled, and plans are available online.
AvailableOsceola County School District
Work include project 1 - baseball field renovation project - remove 115,000 approx SF of existing turf from the baseball field as per engineer specifications; properly dispose of removed material; install under drainage system as per engineer specifications; assess and repair irrigation system as per engineer specifications; re-grade as per engineer specifications; re sod as per engineer specifications; add clay and laser grade infield as per engineer specifications; etc, see outside link.
Posted Date
Nov 5, 2025
Due Date
Dec 3, 2025
Release: Nov 5, 2025
Osceola County School District
Close: Dec 3, 2025
Work include project 1 - baseball field renovation project - remove 115,000 approx SF of existing turf from the baseball field as per engineer specifications; properly dispose of removed material; install under drainage system as per engineer specifications; assess and repair irrigation system as per engineer specifications; re-grade as per engineer specifications; re sod as per engineer specifications; add clay and laser grade infield as per engineer specifications; etc, see outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →