Summary
To provide reassessment field work inspections for the period january 1, 2026 to december 31, 2026. The field work for shall consist of a physical inspection of each property as provided by the assessor’s office. A single exterior photograph shall be taken during the inspection and electronically attached to the respective parcel’s block and lot for future upload to the cama system. Prior to each inspection the contactor shall send each property owner notification of the impending inspection. This notification will be sent no later than two weeks prior to the inspection. Each property shall be physically measured for correct size. An interior inspection is to be attempted at every property being inspected. If the property owner is not present at the time of inspection, an inspection card shall be left requesting a return call to the inspector to gain interior access. Three attempts will be made with made for interior inspections. Sufficient notifications will be left at each attempt. The contractor will need to facilitate an electronic remote way of accessing the interior should a property owner request the interior inspection be performed in that way.