Retrieving RFP details
Release
Close
Illinois Tollway
The work under this contract includes bridge reconstruction, bridge rehabilitation, construction of new pavement and milling and overlaying existing pavement, guardrail removal and installation, earthwork, grading, erosion and sediment control measures and landscaping, drainage, Intelligent Transportation System (ITS) infrastructure, maintenance of traffic and other miscellaneous work.
Reagan Memorial Tollway (I-88) Bridge Rehabilitation Howland Creek to IL Rte 26 Ramp MP 44
5-MP 54
Illinois Tollway
The work under this contract includes bridge rehabilitation, pavement construction and overlay, site clearing, earthwork, grading, erosion and sediment control, landscaping, drainage improvements and cleaning, pavement markings and signage, maintenance of traffic and other miscellaneous work.
Illinois Tollway
The scope of the work shall consist of a bridge deck overlay at BN 827; bridge rehabilitation work at BN 833, BN 851, BN 853, and BN 1471; incidental roadway and shoulder rehabilitation work; drainage, erosion and sediment control measures and landscaping; pavement marking; maintenance of traffic; and other miscellaneous work.
Illinois Tollway
The scope of the work shall consist of bridge patching, bridge overlay, maintenance of traffic and other miscellaneous work. Bid items: 35 CY conc superstructure; 57' of 4" thermoplastic pav marking line; 27 SF cleaning and painting exposed rebar; 12,927 SY of 3/4" bridge deck scarification. See attached file.
Release
Oct 17, 2025
Close
Dec 05, 2025