Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
ITB for interior re-coating of two sewage equalization tanks at the Booster Pumping Facility in Punta Gorda, FL. Contractor must provide all labor, materials and equipment; submit full bidder submittal package; acknowledge material addenda. Non-mandatory pre-submittal conference and site visits scheduled. Compliance requirements include E-Verify and solicitation-specific protest/communication rules.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide reverse osmosis system for kitchen and two (2) - 119 gallon bladdered storage tanks.
Posted Date
Dec 9, 2025
Due Date
Dec 23, 2025
Release: Dec 9, 2025
Close: Dec 23, 2025
Provide reverse osmosis system for kitchen and two (2) - 119 gallon bladdered storage tanks.
AvailableProcurement for the removal of an existing Reverse Osmosis system and installation of a new Reverse Osmosis system, along with two (2) - 119 gallon bladdered storage tanks, for the kitchen at Clearview.
Posted Date
Dec 9, 2025
Due Date
Dec 23, 2025
Release: Dec 9, 2025
Close: Dec 23, 2025
Procurement for the removal of an existing Reverse Osmosis system and installation of a new Reverse Osmosis system, along with two (2) - 119 gallon bladdered storage tanks, for the kitchen at Clearview.
AvailableClean two underground water storage tanks. Work include: sediment removal, cleaning, waste disposal, disinfection, and replacement of waterproofing membrane of two underground drinking water storage tanks. See attached files and outside link.
Posted Date
Nov 20, 2025
Due Date
Jan 9, 2026
Release: Nov 20, 2025
Close: Jan 9, 2026
Clean two underground water storage tanks. Work include: sediment removal, cleaning, waste disposal, disinfection, and replacement of waterproofing membrane of two underground drinking water storage tanks. See attached files and outside link.
AvailableDESIGN BUILD. Design and construction under a Design-Build Contract for (i) three (3) 25,000 gallon Jet A fuel tanks at Fuel Farm B that will interconnect to the existing fuel farm system, and (ii) two (2) 25,000 gallon Jet A fuel tanks at Fuel Farm C that will operate as a separate fuel farm system (the “Project”) at the Birmingham Shuttleworth International Airport (the “Airport”).
Posted Date
Sep 29, 2025
Due Date
Dec 18, 2025
Release: Sep 29, 2025
Close: Dec 18, 2025
DESIGN BUILD. Design and construction under a Design-Build Contract for (i) three (3) 25,000 gallon Jet A fuel tanks at Fuel Farm B that will interconnect to the existing fuel farm system, and (ii) two (2) 25,000 gallon Jet A fuel tanks at Fuel Farm C that will operate as a separate fuel farm system (the “Project”) at the Birmingham Shuttleworth International Airport (the “Airport”).
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis