Retrieving RFP details
Release
Close
Birmingham Airport Authority
DESIGN BUILD. Design and construction under a Design-Build Contract for (i) three (3) 25,000 gallon Jet A fuel tanks at Fuel Farm B that will interconnect to the existing fuel farm system, and (ii) two (2) 25,000 gallon Jet A fuel tanks at Fuel Farm C that will operate as a separate fuel farm system (the “Project”) at the Birmingham Shuttleworth International Airport (the “Airport”).
Design-Build of Three (3) 25,000 Gallon Jet A Tanks at Fuel Farm B and Two (2) 25,000 Gallon Jet A Tanks at Fuel Farm C (RFP)
zip
University of Hawaii at Manoa
Remove (3) existing 2,000-gallon aboveground storage tanks and replace with (2) new 2,000-gallon aboveground storage tanks. Remove existing fuel dispensers, fuel piping, and support associated with the existing tanks and replace with new fuel dispensers, fuel piping, support, and appurtenances for the new tanks. Remove existing automatic tank gauge and replace with new. Provide electrical work associated with the new fuel system.
Collier County
Purchase one complete 5,000-gallon aviation fuel truck for airport operations.
Rides Mass Transit District
Vendors to submit bids for up to eleven (11) 2,500 gallon capacity double-walled above ground storage tanks and equipment and up to nine (9) fuel canopy systems. This project will provide a safer, more comfortable user experience while enhancing our brand profile across our service area. The intent in soliciting bids is to obtain cost savings and to allow for a competitive process while maintaining an acceptable level of quality.
Release
Sep 29, 2025
Close
Dec 18, 2025