Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide Raod and Bridge Re-Construction.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Repair and construction of bridge components. Removal of existing structure, excavation incidental to construction, furnishing all materials, loading, hauling, unloading and placing and for all labor, equipment, tolls and incidentals necessary to complete the work.
Posted Date
Dec 5, 2025
Due Date
Jan 4, 2026
Release: Dec 5, 2025
Close: Jan 4, 2026
Repair and construction of bridge components. Removal of existing structure, excavation incidental to construction, furnishing all materials, loading, hauling, unloading and placing and for all labor, equipment, tolls and incidentals necessary to complete the work.
Premium
Access the largest public sector contact database
Pedestrian bridge construction. This project consists of the construction of a pre-fabricated steel pedestrian bridge approx 260' length at the end of the existing boardwalk in Johnson Park. Construction includes clearing & grubbing, grading, erosion control, drainage, plazas, concrete and paver sidewalk, boardwalk, gateway structures and other items of work.
Posted Date
-
Due Date
Jan 28, 2026
Close: Jan 28, 2026
Pedestrian bridge construction. This project consists of the construction of a pre-fabricated steel pedestrian bridge approx 260' length at the end of the existing boardwalk in Johnson Park. Construction includes clearing & grubbing, grading, erosion control, drainage, plazas, concrete and paver sidewalk, boardwalk, gateway structures and other items of work.
AvailablePedestrian bridge construction. This project consists of the construction of a pre-fabricated steel pedestrian bridge approx 260' length at the end of the existing boardwalk in Johnson Park. Construction includes clearing & grubbing, grading, erosion control, drainage, plazas, concrete and paver sidewalk, boardwalk, gateway structures and other items of work.
Posted Date
-
Due Date
Jan 28, 2026
Close: Jan 28, 2026
Pedestrian bridge construction. This project consists of the construction of a pre-fabricated steel pedestrian bridge approx 260' length at the end of the existing boardwalk in Johnson Park. Construction includes clearing & grubbing, grading, erosion control, drainage, plazas, concrete and paver sidewalk, boardwalk, gateway structures and other items of work.
AvailableRelease: Nov 21, 2025
Close: Jan 7, 2026
Bridge Maintenance Construction.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis