Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Colorado Springs
Bridge Maintenance Construction.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
City of Colorado Springs
Seeking construction management services. See attached file.
Posted Date
Nov 13, 2025
Due Date
Dec 15, 2025
Release: Nov 13, 2025
City of Colorado Springs
Close: Dec 15, 2025
Seeking construction management services. See attached file.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Omaha Public Power District
Bridge replacement.
Posted Date
-
Due Date
Dec 5, 2025
Omaha Public Power District
Close: Dec 5, 2025
Bridge replacement.
AvailableWhite Settlement Independent School District
Construction and Maintenance.
Posted Date
Nov 3, 2025
Due Date
May 29, 2026
Release: Nov 3, 2025
White Settlement Independent School District
Close: May 29, 2026
Construction and Maintenance.
AvailableCity of Palm Springs
Work consists of widening the bridge from a 4-lane arterial to a 6-lane arterial, with three lanes in each direction. The project includes seismic retrofitting, installation of new bridge barriers, bridge supports within the channel, and the addition of a 5-foot sidewalk on the north side and a 10-foot-wide multipurpose trail with a physical barrier for bicyclists on the south side. Includes comprehensive construction management services for the Ramon road bridge at whitewater river project. This includes developing project staging and traffic control plans, implementing a quality assurance program (including materials testing and inspection), reviewing construction surveying, ensuring environmental compliance, and conducting public outreach.
Posted Date
Oct 30, 2025
Due Date
Dec 1, 2025
Release: Oct 30, 2025
City of Palm Springs
Close: Dec 1, 2025
Work consists of widening the bridge from a 4-lane arterial to a 6-lane arterial, with three lanes in each direction. The project includes seismic retrofitting, installation of new bridge barriers, bridge supports within the channel, and the addition of a 5-foot sidewalk on the north side and a 10-foot-wide multipurpose trail with a physical barrier for bicyclists on the south side. Includes comprehensive construction management services for the Ramon road bridge at whitewater river project. This includes developing project staging and traffic control plans, implementing a quality assurance program (including materials testing and inspection), reviewing construction surveying, ensuring environmental compliance, and conducting public outreach.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →