Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Purchase three (3) identical Random Number Generator systems. The Minnesota Lottery is interested in an optional fourth system that includes only promotional draw functionality. Each system will include all necessary hardware and eripherals, and a 5-year warranty. The systems should be secure Linux operating systems or an equally secure equivalent. The systems should be standalone (or otherwise secure) machines that allow for lotto game drawings such as Pick 3™, North 5®, Gopher 5®, and Minnesota Millionaire Raffle™, as well as promotional drawings. The systems should have the ability to produce draw reports, output truly random winning numbers, allow for add-on features or game changes, and be physically, logically, and role-based secure.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Supply and installation of a new standby diesal generator system. This project includes retiring the existing generator in place, replacing the existing automatic transfer switch, and installing a new generator on a poured concrete pad located in the designated alcove near the radio tower.
Posted Date
Dec 17, 2025
Due Date
Jan 22, 2026
Release: Dec 17, 2025
Close: Jan 22, 2026
Supply and installation of a new standby diesal generator system. This project includes retiring the existing generator in place, replacing the existing automatic transfer switch, and installing a new generator on a poured concrete pad located in the designated alcove near the radio tower.
AvailablePurchase and deliver one (1) mobile generators. Minimum 500-kw diesel engine driven trailer mounted generator with sound attenuated weatherproof enclosure and 24-hour storage tank; delivery of generator. Work also consist of construction of booster pump station, construction of a minimum 175kw diesel generator with a sub -base fuel tank, construction of well no. 3 and booster pump station generator, construction of well nos. 1 & 5 and booster pump station generator, construction of masonwood lift station generator, demolition of existing chain link fence, swing out gate and asphalt pavement; construction of a minimum 50kw diesel generator with a sub -base fuel tank. See attached file.
Posted Date
Dec 8, 2025
Due Date
Dec 30, 2025
Release: Dec 8, 2025
Close: Dec 30, 2025
Purchase and deliver one (1) mobile generators. Minimum 500-kw diesel engine driven trailer mounted generator with sound attenuated weatherproof enclosure and 24-hour storage tank; delivery of generator. Work also consist of construction of booster pump station, construction of a minimum 175kw diesel generator with a sub -base fuel tank, construction of well no. 3 and booster pump station generator, construction of well nos. 1 & 5 and booster pump station generator, construction of masonwood lift station generator, demolition of existing chain link fence, swing out gate and asphalt pavement; construction of a minimum 50kw diesel generator with a sub -base fuel tank. See attached file.
Provide the installation of backup building generator.
Posted Date
Dec 8, 2025
Due Date
Jan 26, 2026
Release: Dec 8, 2025
Close: Jan 26, 2026
Provide the installation of backup building generator.
AvailableDESIGN-BUILD - for emergency generator with a functional design and integration for the emergency generator.
Posted Date
Dec 5, 2025
Due Date
Jan 6, 2026
Release: Dec 5, 2025
Close: Jan 6, 2026
DESIGN-BUILD - for emergency generator with a functional design and integration for the emergency generator.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis