Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
DESIGN-BUILD - for emergency generator with a functional design and integration for the emergency generator.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Progressive DESIGN/BUILD services: Significant cutting, off site hauling and disposal of spoil material, and regrading of the existing soil pile covering the majority of the planned generator facility. Site drainage and stormwater management improvements needed to accommodate the additional impervious surface created as result of this project. One 2500kW, 12.47kV generator at the electric utility service point; it is anticipated the generator will operate 18MGD of conventional filters and 6MGD of membrane process trains (total 24 MGD) and two 700 HP high service pumps (4.16kV, 9 MGD capacity each, for 18 MGD total of pumping capacity). The design builders engineer will coordinate with owner to identify load shed scheme and determine what will happen when plant is on generator power. See attached file.
Posted Date
Oct 23, 2025
Due Date
Dec 11, 2025
Release: Oct 23, 2025
Close: Dec 11, 2025
Premium
Access the largest public sector contact database
Progressive DESIGN/BUILD services: Significant cutting, off site hauling and disposal of spoil material, and regrading of the existing soil pile covering the majority of the planned generator facility. Site drainage and stormwater management improvements needed to accommodate the additional impervious surface created as result of this project. One 2500kW, 12.47kV generator at the electric utility service point; it is anticipated the generator will operate 18MGD of conventional filters and 6MGD of membrane process trains (total 24 MGD) and two 700 HP high service pumps (4.16kV, 9 MGD capacity each, for 18 MGD total of pumping capacity). The design builders engineer will coordinate with owner to identify load shed scheme and determine what will happen when plant is on generator power. See attached file.
Design-Build: Provide antioch water treatment plant (wtp) emergency backup generator under a progressive design-build agreement.
Posted Date
Oct 24, 2025
Due Date
Dec 11, 2025
Release: Oct 24, 2025
Close: Dec 11, 2025
Design-Build: Provide antioch water treatment plant (wtp) emergency backup generator under a progressive design-build agreement.
Soliciting proposals for Design Bid Build Professional Design Services for the renovation of the 46,610 sq. ft. County Administration Building.
Posted Date
Nov 24, 2025
Due Date
Dec 22, 2025
Release: Nov 24, 2025
Close: Dec 22, 2025
Soliciting proposals for Design Bid Build Professional Design Services for the renovation of the 46,610 sq. ft. County Administration Building.
AvailableProvide professional design and construction services for emergency slope stabilization. Providing both the engineering design and construction necessary to stabilize the slope, extend the existing retaining wall, and reestablish vegetation in the affected area. Perform slope stabilization for approximately 13,500 SF of affected area. Grading and excavation necessary to properly shape, stabilize and prepare the disturbed slope areas. Installation and maintenance of all required erosion and sediment control measures in accordance with Georgia law and local BMP standards. Extend the existing retaining wall approximately 40 feet to the west below the tanks. Reestablish vegetation on all disturbed areas upon completion of slope stabilization. Two applications of hydroseeding: the first immediately after completion of grading, and the second after initial germination or as needed to ensure full vegetation establishment.
Posted Date
Nov 26, 2025
Due Date
Dec 31, 2025
Release: Nov 26, 2025
Close: Dec 31, 2025
Provide professional design and construction services for emergency slope stabilization. Providing both the engineering design and construction necessary to stabilize the slope, extend the existing retaining wall, and reestablish vegetation in the affected area. Perform slope stabilization for approximately 13,500 SF of affected area. Grading and excavation necessary to properly shape, stabilize and prepare the disturbed slope areas. Installation and maintenance of all required erosion and sediment control measures in accordance with Georgia law and local BMP standards. Extend the existing retaining wall approximately 40 feet to the west below the tanks. Reestablish vegetation on all disturbed areas upon completion of slope stabilization. Two applications of hydroseeding: the first immediately after completion of grading, and the second after initial germination or as needed to ensure full vegetation establishment.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis