Summary
Demo and remove buildings 115, 131, 133, tent structure 321, abandoned electrical components, guardrail, fencing, and concrete and asphalt areas. Purchase and install storm water control structures to include catch basins, piping, and trench drains to provide a proper flow channel and remove water from the areas allowing the grounds to be maintained. Purchase and install the required electrical conduit and wiring to support new fabric shelters. Prepare areas for placement of a new concrete access road, concrete tent pad, and concrete approach around building 137 and an asphalt shoulder patch as shown on the pavements plan. Purchase and install two new tensioned fabric shelters with liners, electrical equipment, interior lights, and doors as shown on attached drawing with one shelter having dehumidification equipment for humidity control.