Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project includes the following work: the installation of approximately 5,300 of 12" HDPE water transmission main and associated appurtenances.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work for this project includes the construction of approx. 1,222 LF of new eight-inch water main at four separate locations for the abandonment of approx. 2,115 LF of twenty-inch transmission main. Work includes 557 Ton HMA, 13A; 327 SF Det F4, modified concrete curb and gutter; 948 SF of concrete sidewalk; 808 SF of 6" concrete curb ramp; traffic control items; 313 SY of performance turf establishment; 594 LF of water main; 383 LF of water main, dir bore; 8 EA water valve and box; 2 EA water main, insertion valve; 271 LF of water service pipe; 5 EA bond restoration; 6 EA water service. See outside link for complete scope of work.
Posted Date
Oct 26, 2025
Due Date
Dec 11, 2025
Release: Oct 26, 2025
Close: Dec 11, 2025
Work for this project includes the construction of approx. 1,222 LF of new eight-inch water main at four separate locations for the abandonment of approx. 2,115 LF of twenty-inch transmission main. Work includes 557 Ton HMA, 13A; 327 SF Det F4, modified concrete curb and gutter; 948 SF of concrete sidewalk; 808 SF of 6" concrete curb ramp; traffic control items; 313 SY of performance turf establishment; 594 LF of water main; 383 LF of water main, dir bore; 8 EA water valve and box; 2 EA water main, insertion valve; 271 LF of water service pipe; 5 EA bond restoration; 6 EA water service. See outside link for complete scope of work.
Premium
Access the largest public sector contact database
Work inlcudes 6", 16", 18", and 24" DIP water main installed by open cut and horizontal directional bore construction methods, including: pavement removal; trench excavation; water main pipe materials and installation; valves and valve vaults; fire hydrant assemblies including hydrant and auxiliary valve; water service connections; pipe bedding; trench backfill; pavement replacement; driveway replacement; curb and gutter replacement; parkway restoration; traffic control; water main pressure testing and disinfection. See outside link.
Posted Date
Nov 17, 2025
Due Date
Jan 9, 2026
Release: Nov 17, 2025
Close: Jan 9, 2026
Work inlcudes 6", 16", 18", and 24" DIP water main installed by open cut and horizontal directional bore construction methods, including: pavement removal; trench excavation; water main pipe materials and installation; valves and valve vaults; fire hydrant assemblies including hydrant and auxiliary valve; water service connections; pipe bedding; trench backfill; pavement replacement; driveway replacement; curb and gutter replacement; parkway restoration; traffic control; water main pressure testing and disinfection. See outside link.
AvailableWork inlcudes 6", 16", 18", and 24" DIP water main installed by open cut and horizontal directional bore construction methods, including: pavement removal; trench excavation; water main pipe materials and installation; valves and valve vaults; fire hydrant assemblies including hydrant and auxiliary valve; water service connections; pipe bedding; trench backfill; pavement replacement; driveway replacement; curb and gutter replacement; parkway restoration; traffic control; water main pressure testing and disinfection. See outside link.
Posted Date
Nov 17, 2025
Due Date
Jan 9, 2026
Release: Nov 17, 2025
Close: Jan 9, 2026
Work inlcudes 6", 16", 18", and 24" DIP water main installed by open cut and horizontal directional bore construction methods, including: pavement removal; trench excavation; water main pipe materials and installation; valves and valve vaults; fire hydrant assemblies including hydrant and auxiliary valve; water service connections; pipe bedding; trench backfill; pavement replacement; driveway replacement; curb and gutter replacement; parkway restoration; traffic control; water main pressure testing and disinfection. See outside link.
AvailableThis project consists of 17,180 LF of 16" water transmission main; 50 LF of 4" water transmission main tie in; 160 LF of 6" water transmission main tie in; 600 LF of 8" water transmission main perpendicular. Additionally, there is a 1,150 LF 8" water transmission main, a new master meter vault and appurtenances. See attached file.
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
This project consists of 17,180 LF of 16" water transmission main; 50 LF of 4" water transmission main tie in; 160 LF of 6" water transmission main tie in; 600 LF of 8" water transmission main perpendicular. Additionally, there is a 1,150 LF 8" water transmission main, a new master meter vault and appurtenances. See attached file.