Summary
Water main relay project. Work includes 990 CY of excavation for water pipes; 50 LF of 4" DI pipe; 285 LF of 6" DI pipe; 3,225 LF of 8" DI pipe; 1,890 LF of 12" DI pipe; 11 EA fire hydrants with center compression locks; 20 EA 8" gate valve; 7 EA 12" gate valve; 250 EA 3/4" water service connection from water main to curb stop; 7 EA 1" water service connection from water main to curb stop; 280 LF of concrete curb; 330 SY of concrete footway paving; 4,900 SY of milling; 20 SY of topsoil and sodding; 52 LF of 8" perforated HDPE pipe; 50 LF of 12" perforated PP pipe; 27 LF of 8" solid PVC pipe; 36 LF of 8" DI pipe; 14 LF of 12" DI pipe; 1 LS erosion and sediment control measures. See attached files.