Summary
Sewer reconstruction, sewer lining, relay of water mains. Work includes 1 EA rehabilitation of sewer manholes/ wellholes; 2,320 CY of excavation for sewer pipes; 990 CY of excavation for pipe sewers including sheeting and shoring; 780 LF of 18" RCP sewer; 215 LF of 21" RCP sewer; 205 LFo f 24" RCP sewer; 410 LF of 30" RCP sewer; 420 LF of 36" RCP sewer; 250 LF of 42" RCP sewer; 1,040 LF of 6" lateral connections; 6 EA sewer manholes for pipes 30" and under; 5 EA sewer manholes for pipes 36" and over; 145 LF of concrete curb; 35 SY of milling; 210 SY of concrete footway paving; 195 LF of 6" DI pipe; 2,255 LF of 8" DI pipe; 10 LF of 20" DI pipe; 35 LF of 24" DI pipe; 8 EA 6" gate valves; 14 EA 8" gate valves; 3,365 LF of 3/4" copper service pipe from water main to curb stop; 120 LF of 1" copper service pipe from water main to curb stop; 145 LF of concrete curb; 210 SY of concrete footway paving; 25 SY of milling; 156 LF Of 8" solid HDPE pipe; 203 LF of 8" perforated HDPE pipe; 17 LF of 8" solid PVC pipe; 319 LF of concrete curb; 1 LS erosion and sediment control measures. See attached files.