Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Fort Worth seeks qualifications from design-build teams to replace the complete lighting system on the W. 7th Street Bridge. The scope includes new LED fixtures for arches, sidewalks, underpass, and decorative roadway lighting, plus new wiring, a communications-capable lighting control system, and any needed conduit retrofit/replacement. The project also includes median reconstruction around one damaged street lighting assembly.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Design-Build and replacement of the Bank Street Bridge, including salvaging the existing truss for storage, in Wayne County, Ohio.
Posted Date
-
Due Date
Jan 20, 2026
Close: Jan 20, 2026
Design-Build and replacement of the Bank Street Bridge, including salvaging the existing truss for storage, in Wayne County, Ohio.
AvailableBridge design-build project.
Posted Date
Dec 17, 2025
Due Date
Jan 29, 2026
Release: Dec 17, 2025
Close: Jan 29, 2026
Bridge design-build project.
AvailableDESIGN-BUILD: Project involves design-build services for the route 50 bridge over cedar swamp creek project.
Posted Date
Dec 2, 2024
Due Date
Jan 22, 2026
Release: Dec 2, 2024
Close: Jan 22, 2026
DESIGN-BUILD: Project involves design-build services for the route 50 bridge over cedar swamp creek project.
AvailableDESIGN-BUILD Provide design-build services to for ADA upgrades at three nyct stations including state of good repair.
Posted Date
Dec 30, 2025
Due Date
Feb 25, 2026
Release: Dec 30, 2025
Close: Feb 25, 2026
DESIGN-BUILD Provide design-build services to for ADA upgrades at three nyct stations including state of good repair.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis