Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Invitation for Bid B2625884 requests replacement of the BBC-EBBC switchgear at the PHL-1690.25 Substation for the City of Philadelphia, Department of Aviation. Bidders must be approved sellers, pay a non-refundable $600 bid processing fee, and submit required forms and attachments electronically. The solicitation includes a project manual, bid drawings, pricing spreadsheet, and amendments, with a required bid opening on the buyer’s procurement portal.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This project includes the following: Demolition of existing switchgear at substation BBC and EBBC; running new underground conduit from spare breakers to junction boxes; installing and testing new switchgear equipment and related accessories; phasing and minimizing power outages during construction with temporary power solutions.
Posted Date
Dec 23, 2025
Due Date
Jan 29, 2026
Release: Dec 23, 2025
Close: Jan 29, 2026
This project includes the following: Demolition of existing switchgear at substation BBC and EBBC; running new underground conduit from spare breakers to junction boxes; installing and testing new switchgear equipment and related accessories; phasing and minimizing power outages during construction with temporary power solutions.
AvailableSoliciting bids for 15kV and 38kV Switchgear and related field engineering services for assembly.
Posted Date
Dec 9, 2025
Due Date
Feb 13, 2026
Release: Dec 9, 2025
Close: Feb 13, 2026
Soliciting bids for 15kV and 38kV Switchgear and related field engineering services for assembly.
AvailableThe City of Philadelphia Department of Aviation is soliciting bids to remove and replace the Terminal BC baggage roof at Philadelphia International Airport, including any necessary repairs to underlying structure. The procurement is an Invitation for Bid with an estimated budget over $5,000,000; bidders must pay a $600 bid processing fee and submit proposals electronically per the City’s instructions. The solicitation was posted 2026-01-14 and the bid opening is scheduled for 2026-02-03 at 10:30 AM ET (so the opportunity is open as of 2026-01-16).
Posted Date
Jan 14, 2026
Due Date
Feb 3, 2026
Release: Jan 14, 2026
Close: Feb 3, 2026
The City of Philadelphia Department of Aviation is soliciting bids to remove and replace the Terminal BC baggage roof at Philadelphia International Airport, including any necessary repairs to underlying structure. The procurement is an Invitation for Bid with an estimated budget over $5,000,000; bidders must pay a $600 bid processing fee and submit proposals electronically per the City’s instructions. The solicitation was posted 2026-01-14 and the bid opening is scheduled for 2026-02-03 at 10:30 AM ET (so the opportunity is open as of 2026-01-16).
This project consists of the removal of existing roof membrane, insulation, non-structural LWC, associated flashings, and select roof-top equipment; infill of roof openings exposed during demolition; replacement of deteriorated and/or provision of supplemental framing and blocking; provision of R30 insulation and tapered insulation; provision of SBS modified bitumen roof with associated flashings, accessories; provision of scuppers, downspouts and their accessories; provision of PVC roof with associated flashings and accessories; selective replacement of roof drain components; provision of roof ladders, ladder cages, non-penetrating roof stairs, guardrail assemblies, and fall-protection anchors; provision of walkpads; replacement of unit skylights; replacement and/or modification of HVAC condensate lines; replacement and/or modification of heat tapes; construction enclosures with EIFS finish and access doors.
Posted Date
Dec 23, 2025
Due Date
Feb 3, 2026
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Feb 3, 2026
This project consists of the removal of existing roof membrane, insulation, non-structural LWC, associated flashings, and select roof-top equipment; infill of roof openings exposed during demolition; replacement of deteriorated and/or provision of supplemental framing and blocking; provision of R30 insulation and tapered insulation; provision of SBS modified bitumen roof with associated flashings, accessories; provision of scuppers, downspouts and their accessories; provision of PVC roof with associated flashings and accessories; selective replacement of roof drain components; provision of roof ladders, ladder cages, non-penetrating roof stairs, guardrail assemblies, and fall-protection anchors; provision of walkpads; replacement of unit skylights; replacement and/or modification of HVAC condensate lines; replacement and/or modification of heat tapes; construction enclosures with EIFS finish and access doors.
Available