Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Dallas
Purchase of wind sock and 3 gallon sprayer.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Mesa County
Brand name or equal intelli-spray 9TDE200 twin reel 150-200 gallon right-of-way in-bed sprayer.
Posted Date
Nov 21, 2025
Due Date
Dec 7, 2025
Release: Nov 21, 2025
Mesa County
Close: Dec 7, 2025
Brand name or equal intelli-spray 9TDE200 twin reel 150-200 gallon right-of-way in-bed sprayer.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Birmingham Airport Authority
DESIGN BUILD. Design and construction under a Design-Build Contract for (i) three (3) 25,000 gallon Jet A fuel tanks at Fuel Farm B that will interconnect to the existing fuel farm system, and (ii) two (2) 25,000 gallon Jet A fuel tanks at Fuel Farm C that will operate as a separate fuel farm system (the “Project”) at the Birmingham Shuttleworth International Airport (the “Airport”).
Posted Date
Sep 29, 2025
Due Date
Dec 18, 2025
Release: Sep 29, 2025
Birmingham Airport Authority
Close: Dec 18, 2025
DESIGN BUILD. Design and construction under a Design-Build Contract for (i) three (3) 25,000 gallon Jet A fuel tanks at Fuel Farm B that will interconnect to the existing fuel farm system, and (ii) two (2) 25,000 gallon Jet A fuel tanks at Fuel Farm C that will operate as a separate fuel farm system (the “Project”) at the Birmingham Shuttleworth International Airport (the “Airport”).
AvailableAir Force Life Cycle Management Center
The following is a list of technical requirements for the wind tunnel balance: 1. The balance must have an outer diameter of 0.495-0.505". 2. The length must be between 3-7". 3. The moment must have a measurement of 3 axes, ± 50-80 lbf in pitch. 4. The balance must be moment-style 6 component balance (3 force & 3 moments). 5. The balance must have a side/radial/normal force of ± 25-50 lbf (target). 6. The balance must have an axial (x direction) force of ± 50-100 lbf (target). 7. The balance must have a pitch/roll/yaw moment of ± 75-100 lbf-in (target). 8. The balance must have Static Calibration Matrix & Documentation. 9. The balance must include Stress Analysis Documentation. See attached file.
Posted Date
Nov 24, 2025
Due Date
Dec 5, 2025
Release: Nov 24, 2025
Air Force Life Cycle Management Center
Close: Dec 5, 2025
The following is a list of technical requirements for the wind tunnel balance: 1. The balance must have an outer diameter of 0.495-0.505". 2. The length must be between 3-7". 3. The moment must have a measurement of 3 axes, ± 50-80 lbf in pitch. 4. The balance must be moment-style 6 component balance (3 force & 3 moments). 5. The balance must have a side/radial/normal force of ± 25-50 lbf (target). 6. The balance must have an axial (x direction) force of ± 50-100 lbf (target). 7. The balance must have a pitch/roll/yaw moment of ± 75-100 lbf-in (target). 8. The balance must have Static Calibration Matrix & Documentation. 9. The balance must include Stress Analysis Documentation. See attached file.
Naval Supply Systems Command (NAVSUP)
5 lot, bubble wind flat, NSN: 9340016581835.
Posted Date
Sep 19, 2025
Due Date
Jan 20, 2026
Release: Sep 19, 2025
Naval Supply Systems Command (NAVSUP)
Close: Jan 20, 2026
5 lot, bubble wind flat, NSN: 9340016581835.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →