Summary
Work includes emolition and removal of pumping units 3a & 3b and the replacement/refurbishment of all remaining discharge "b" valves at the riverside pumping station. A water system audit of the house water plumbing system at riverside pumping station is also included in the project; remove and dispose of existing pumping units 3a and 3b, motors, piping; remove and dispose of concrete foundation pads and supports; furnish and install blind flanges on the suction and discharges termination ends as shown on plans; furnish and install floor grating (at suction); replacement of existing discharge "b" valves (pumping units 1a, 1b, 2, 4, 6a & 6b): remove and dispose of existing ball & cone check valves, drive units and controllers; remove and dispose of existing valve supports. See attached file.