Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Cleaning of the wet wells at twenty (20) remote sewage pump stations, as well as the influent pump station wet well at the Scarborough Wastewater Treatment Facility. The cleaning operation is to include the physical removal of all floating material, bottom sediment, grit, and materials that have collected on the walls of said wet well.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Wet well access improvements include replacing two (2) existing 48" circular wet well manhole covers with new rectangular hatches and replacing corroded existing slide gate guides with new stainless steel guides. The valve replacement will replace five (5) existing 16-inch pump check valves and three (3) existing 6" wet well drain valves. The Work will require implementation of traffic control and temporary sewer bypass of the pump station. Other work includes concrete demolition, partial regrading of the pump station driveway, and PVC liner repair.
Posted Date
Dec 1, 2025
Due Date
Jan 26, 2026
Release: Dec 1, 2025
Close: Jan 26, 2026
Premium
Access the largest public sector contact database
Wet well access improvements include replacing two (2) existing 48" circular wet well manhole covers with new rectangular hatches and replacing corroded existing slide gate guides with new stainless steel guides. The valve replacement will replace five (5) existing 16-inch pump check valves and three (3) existing 6" wet well drain valves. The Work will require implementation of traffic control and temporary sewer bypass of the pump station. Other work includes concrete demolition, partial regrading of the pump station driveway, and PVC liner repair.
AvailableThe Project consists of site preparation and installation of a corrosion-proof polymer concrete precast wet well using the caisson method with tremie pour for the bottom seal. The scope includes clearing and grubbing the site, installing erosion and sedimentation controls, excavating for the wet well shaft, assembling and sealing wet well sections with retainer straps and watertight joints, pouring the tremie seal concrete, installing the secondary pour for the wet well bottom with chamfered edges, and conducting buoyancy calculations, watertightness testing, and backfilling.
Posted Date
Dec 8, 2025
Due Date
Jan 7, 2026
Release: Dec 8, 2025
Close: Jan 7, 2026
The Project consists of site preparation and installation of a corrosion-proof polymer concrete precast wet well using the caisson method with tremie pour for the bottom seal. The scope includes clearing and grubbing the site, installing erosion and sedimentation controls, excavating for the wet well shaft, assembling and sealing wet well sections with retainer straps and watertight joints, pouring the tremie seal concrete, installing the secondary pour for the wet well bottom with chamfered edges, and conducting buoyancy calculations, watertightness testing, and backfilling.
AvailableRemoval and disposal of two suction lift pumps, one back-up gas engine, pump controls, piping and valves in the pump station and wet well, various electrical equipment, 500-gallon LP gas aboveground storage tank and related appurtenances. Abandonment of wet well and various repairs to the pump station aboveground building. Furnish and installation of new submersible pumps, wet well, valve vault, piping and valves, electric generator, electrical and instrumentation work.
Posted Date
Jun 18, 2025
Due Date
Jan 15, 2026
Release: Jun 18, 2025
Close: Jan 15, 2026
Removal and disposal of two suction lift pumps, one back-up gas engine, pump controls, piping and valves in the pump station and wet well, various electrical equipment, 500-gallon LP gas aboveground storage tank and related appurtenances. Abandonment of wet well and various repairs to the pump station aboveground building. Furnish and installation of new submersible pumps, wet well, valve vault, piping and valves, electric generator, electrical and instrumentation work.
AvailableRemoval and disposal of two suction lift pumps, one back-up gas engine, pump controls, piping and valves in the pump station and wet well, various electrical equipment, 500-gallon LP gas aboveground storage tank and related appurtenances. Abandonment of wet well and various repairs to the pump station aboveground building. Furnish and installation of new submersible pumps, wet well, valve vault, piping and valves, electric generator, electrical and instrumentation work.
Posted Date
Nov 26, 2025
Due Date
Jan 15, 2026
Release: Nov 26, 2025
Close: Jan 15, 2026
Removal and disposal of two suction lift pumps, one back-up gas engine, pump controls, piping and valves in the pump station and wet well, various electrical equipment, 500-gallon LP gas aboveground storage tank and related appurtenances. Abandonment of wet well and various repairs to the pump station aboveground building. Furnish and installation of new submersible pumps, wet well, valve vault, piping and valves, electric generator, electrical and instrumentation work.