Briar Creek Dry Dam Road Repair Project RFP
Project involves replacing a steel pipe culvert with a corrugated metal pipe arch culvert, 2,620 feet of access road repairs and installation of rock protection.
Description: Remove all materials from the spillway stilling basin. These materials include, but are not limited to fine sediments, gravels, cobbles, boulders, chain link fence materials, and large woody materials. Remove material that is present in the 6-inch drains on two of the chute blocks to the greatest extent possible. Perform an inspection of the concrete floor and all other spillway stilling basin features upon completion of the sediment and materials removal.
Federal · CA, US
Original attachments and procurement documents tied to this bid.
These related opportunities are still open for bidding.
CountyPA
Posted
Nov 18, 2026
Dec 3, 2026
Project involves replacing a steel pipe culvert with a corrugated metal pipe arch culvert, 2,620 feet of access road repairs and installation of rock protection.
Washington State Department of Enterprise Services
State AgencyWA
Posted
-
Dec 18, 2026
The Department of Enterprise Services is issuing this competitive solicitation under RCW 39.26 to establish multiple cleanup-services contracts. Awards will cover statewide and specified geographic areas for Washington state agencies and eligible purchasers. The procurement encompasses multiple categories of cleanup services.
Washington State Department of Enterprise Services
State AgencyWA
Posted
-
Dec 18, 2026
The Department of Enterprise Services is issuing this competitive solicitation under RCW 39.26 to establish multiple cleanup-services contracts. Awards will cover statewide and specified geographic areas for Washington state agencies and eligible purchasers. The procurement encompasses multiple categories of cleanup services.
CountyTX
Posted
Nov 16, 2026
Jan 12, 2027
This procurement solicits construction services to repair Cedar Creek Flood Prevention Dam No. 103, including restoration of the plunge pool, embankment and spillway control sections, and replacement/repair of riser structure components. Major work includes clearing, grubbing and revegetation, fencing, lime-treated earthfill and riprap armoring, shoreline wave protection, lime stabilization of slopes, excavation and armoring of an upstream silt berm, replacement of a slide gate and trash racks, and regrading the auxiliary spillway. The project is estimated between $4,000,000 and $4,817,500, has an expected duration of 297 calendar days, and requires compliance with applicable federal and state prevailing wage requirements (including Davis-Bacon).