Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project includes improvements to the existing process waste lagoon which consists of the following work: construction staking; clearing and grubbing; demolition, earthwork, excavation, sorting and stockpiling of material within project area; construction of laydown areas, entrances and roads including gravel surface, base and subbase; installation and maintenance of erosion control devices; construction of drainage diversion; construction of new expansion cell lagoon system with piping, embankment, liner, riprap, structures and fencing; construction of process waste piping; finish grading, seeding and mulching.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This RFP is for the complete construction and testing of the Ocean Pines Wastewater Treatment Plant Emergency Storage Lagoon Vertical Expansion project.
Posted Date
-
Due Date
Feb 20, 2026
Close: Feb 20, 2026
This RFP is for the complete construction and testing of the Ocean Pines Wastewater Treatment Plant Emergency Storage Lagoon Vertical Expansion project.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Pittsburgh is soliciting proposals from qualified businesses to develop a Zero Waste Municipal Plan and to design and pilot an expansion of composting within the city. The selected contractor will provide zero‑waste and compost planning services and deliver recommendations and implementation support in coordination with City Planning and Public Works. The procurement includes a pre‑proposal meeting and seeks innovative, data‑driven strategies to reduce waste and expand composting citywide.
Posted Date
Jan 21, 2026
Due Date
Mar 9, 2026
Release: Jan 21, 2026
Close: Mar 9, 2026
The City of Pittsburgh is soliciting proposals from qualified businesses to develop a Zero Waste Municipal Plan and to design and pilot an expansion of composting within the city. The selected contractor will provide zero‑waste and compost planning services and deliver recommendations and implementation support in coordination with City Planning and Public Works. The procurement includes a pre‑proposal meeting and seeks innovative, data‑driven strategies to reduce waste and expand composting citywide.
AvailableConstructing a solid waste convenience center that consists of the following: prefabricated attendant building, cast in place concrete retaining walls, paved areas (concrete and asphalt), yard waste and waste tire stockpile areas, utilities (electrical, water, sewer) and erosion control devices (sediment basin, channels, and culverts).
Posted Date
Jan 9, 2026
Due Date
Feb 17, 2026
Release: Jan 9, 2026
Close: Feb 17, 2026
Constructing a solid waste convenience center that consists of the following: prefabricated attendant building, cast in place concrete retaining walls, paved areas (concrete and asphalt), yard waste and waste tire stockpile areas, utilities (electrical, water, sewer) and erosion control devices (sediment basin, channels, and culverts).
AvailableConstructing a solid waste convenience center that consists of the following: prefabricated attendant building, cast in place concrete retaining walls, paved areas (concrete and asphalt), yard waste and waste tire stockpile areas, utilities (electrical, water, sewer) and erosion control devices (sediment basin, channels, and culverts).
Posted Date
Jan 9, 2026
Due Date
Feb 17, 2026
Release: Jan 9, 2026
Close: Feb 17, 2026
Constructing a solid waste convenience center that consists of the following: prefabricated attendant building, cast in place concrete retaining walls, paved areas (concrete and asphalt), yard waste and waste tire stockpile areas, utilities (electrical, water, sewer) and erosion control devices (sediment basin, channels, and culverts).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →