Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project generally consists of construction of permeable asphaltic concrete pavement, construction of concrete curb and gutter and required adjacent pavement, sidewalk, driveway approach, construction of concrete curb and walkways, installation of synthetic turf and stabilized decomposed granite, install concrete pavers, furnish and install picnic shelters, light poles and fixtures, lighting and electrical system, park furniture including benches, picnic tables, litter receptacles, drinking fountain, adjustment of existing catch basins and installing dry wells, furnish and install perimeter fence with single and double gates, construction of concrete perimeter wall with integrated lighting. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
2025 capital improvement project phase II - HVAC work.
Posted Date
Dec 4, 2025
Due Date
Jan 13, 2026
Release: Dec 4, 2025
Close: Jan 13, 2026
2025 capital improvement project phase II - HVAC work.
Available2025 capital improvement project phase II - electrical work.
Posted Date
Dec 4, 2025
Due Date
Jan 13, 2026
Release: Dec 4, 2025
Close: Jan 13, 2026
2025 capital improvement project phase II - electrical work.
Available2025 capital improvement project phase ii - general trades work.
Posted Date
Dec 4, 2025
Due Date
Jan 13, 2026
Release: Dec 4, 2025
Close: Jan 13, 2026
2025 capital improvement project phase ii - general trades work.
AvailableThe City of Salinas requests Statements of Qualifications (RFQual) for professional engineering design services for the Boronda Road Congestion Relief Phase 2 project (CIP 9510), covering ~1.1 miles of East Boronda Road including multi-lane roundabouts, stormwater treatment, shared-use paths, bike lanes, bus pullouts, sidewalks, ADA ramps, utility coordination and related improvements. The procurement is a qualifications-based solicitation (RFQual); SOQs must be submitted electronically via PlanetBids by the stated due date.
Posted Date
Dec 4, 2025
Due Date
Jan 15, 2026
Release: Dec 4, 2025
Close: Jan 15, 2026
The City of Salinas requests Statements of Qualifications (RFQual) for professional engineering design services for the Boronda Road Congestion Relief Phase 2 project (CIP 9510), covering ~1.1 miles of East Boronda Road including multi-lane roundabouts, stormwater treatment, shared-use paths, bike lanes, bus pullouts, sidewalks, ADA ramps, utility coordination and related improvements. The procurement is a qualifications-based solicitation (RFQual); SOQs must be submitted electronically via PlanetBids by the stated due date.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis